BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2026 at 7:00 PM

Updated February 13, 2026

Site work and new construction of an educational facility in Tracy, California. Completed plans call for the construction of a two-story above grade educational facility; and for site work for a educational facility.

Proposals are sought from qualified entities to provide constructability review, value engineering, master scheduling, cost estimating, budgeting, and construction services for the development and construction of the Kimball High School 2-Story Science Wing Project. Respondents must submit a completed Statement of Qualifications along with their proposal. Submission requirements include five bound copies, one unbound copy, and one electronic copy on a USB flash drive. All contractors must be registered and qualified to perform public work, and must comply with prevailing wage and skilled workforce requirements. First-tier electrical, mechanical, and plumbing subcontractors must also be prequalified. Prequalification must be completed through PQBIDS as indicated on the District's website. Questions regarding this RFQ/P may be directed to rich.dunlap@pro-k12.com and evento@tusd.net and must be submitted in writing on or by 12:00 P.M. ON MONDAY, FEBRUARY 2, 2026. 1. Review design and support documentation for content, constructability, completeness, scheduling, clarity, consistency, and coordination. 2. Undertake value-engineering analysis and prepare reports with recommendations to District and Architect of Record to maintain established program budget and specifications. 3. Provide detailed cost estimates. 4. Expedite design reviews, including modifications, if any, based on value analysis. 5. Provide a proposed Guaranteed Maximum Price ("GMP") for the construction of the project with identified subcontractor bids and self-performed work. The Kimball High School 2-Story Wing Project (Increment 1) involves the construction of a new 11,520-square-foot modular classroom building designed to expand the school's instructional capacity. This two-story structure features an integrated outdoor breezeway and a dedicated staircase, providing both functional circulation and modern architectural appeal. Built for permanence and durability, the modular building will be installed on a slab-on-grade foundation system designed and provided by the modular building contractor. To ensure the successful completion of the campus expansion, the scope of work for Increment 1 requires close coordination with Increment 2, which encompasses the site component of the project. This phased approach necessitates proactive logistical management and technical integration to ensure the modular building aligns with the sites infrastructure, utilities, and surrounding environment. Completion Date: July 4, 2027 Project Estimate: $8,900,000.00

Post-Bid

Educational

$8,900,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
13
Bidding Soon
1,929
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2026

October 16, 2026

Project location map

To be determined, Tracy, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.