BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 24, 2026 at 7:00 PM

Updated February 25, 2026

Renovation of a mixed-use development in Louisville, Kentucky. Completed plans call for the renovation of a educational facility; and fitness / recreation center.

The majority of buildings on the Kentucky School for the Blind campus are currently heated through a central steam plant. As part of this project, the existing steam system serving Howser Hall, Langman Gym, and the Gregory Recreation Center will be replaced with a new decentralized heating plant. High-efficiency, gas-fired condensing boilers will be installed within Howser Hall and Langman Gym. A new packaged rooftop unit will be installed to provide both heating and cooling for the Gregory Recreation Center. In conjunction with the steam plant conversion, the existing air-handling units and terminal units within Richie Auditorium will be replaced in kind. Within the Begley Maintenance Building, new mini-split systems will be installed to provide heating and cooling. In addition, a new energy recovery ventilator (ERV) will be installed in Begley to provide code compliant ventilation. Only online bids will be accepted. Emailed and hard copies delivered by any method will not be accepted. On the bidding line, bidders must enter $0.00 for Contract Amount in the e-procurement system. The actual contract amount must be entered on the Official Bid Document and submitted as an attachment in the e-procurement system. Vendors should review and update all addresses and contact persons for their account prior to bid submission. The entire Official Bid Document and Bid Bond (if required) should be combined as one PDF and uploaded. Contractors will need to download bid documents, specifications, and drawings from the provided online source. Those who receive plans and specifications from other sources will not be registered as plan holders and will not receive addenda.

Award

Educational

$4,173,000.00

Public - State/Provincial

Renovation

83

24

14

5

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
251
Active Projects
163
Bidding Soon
1,878
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2026

February 12, 2026

Project location map

1867 Frankfort Ave, Louisville, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.