Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 3, 2026 at 7:00 PM
Updated March 6, 2026
Site work and new construction of a residential development in Sharon, Connecticut. Completed plans call for the construction of a 1,350-square-foot, two-story above grade residential development; and for site work for a residential development.
The Sharon Housing Trust is looking for bids from qualified contractors to build a new-construction 2-story, 1350 sf home in Sharon for their affordable housing program. Build your community and help increase the availability of affordable housing in our area. The Sharon Housing Trust, an organization dedicated to increasing the availability of affordable housing in Sharon, CT, is soliciting bids to construct a new single-family residence at 160 Silver Lake Shore Rd. The scope of work includes: Demolition of an existing cottage Construction of the new building Drilling a well and connecting to existing septic tank Installation of a gravel driveway and parking area Grading the site for drainage The proposed house is an approximately 1,350 square-foot, 2-story stick-framed structure with truss roof and poured concrete crawl-space foundation. The house site is a pre-existing, nonconforming lot in the RR zone, but building in the existing footprint will be allowed; the lot is located in the Wetlands Upland Review area. Budget is an important consideration for this project. The attached scope of work describes materials and systems that have been selected to keep construction straightforward and cost-effective, and to avoid delays during construction. We are hoping to begin construction by April 1, 2026, with an estimated completion date of December 31, 2026. We are accepting bids that are fixed price, with limited allowance for time and materials. The full scope of work is below. We look forward to reviewing your proposal Please submit your bids via email, with your completed copy of the Sharon Housing Trust Single-Family Residence Bidder Specifications Sheet, to: 1. Christine Gray, christine@cgarch.com with copies to maja@cgarch.com. Question Deadline 01/23/2026 QUESTIONS DUE If you have any questions, please reach out to the Bid Contact listed on the front page (Christine Gray, AIA, christine@cgarch.com). Questions and answers will be compiled and posted on CT Source as an Addendum to this ITB. Our written answers will be considered a part of this ITB, please check back in on January 19 th for any additional answers.
Post-Bid
Residential Subdivision
$350,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2026
April 1, 2026
160 Silver Lake Shore Rd, Sharon, CT
Related To This Project
Sharon, CT
Bid Date: Dec 19 2025
Sharon, CT
Bid Date: Sep 19 2025
Sharon, CT
Bid Date: Sep 02 2025
Sharon, CT
Bid Date: Sep 19 2025
Sharon, CT
Bid Date: Jul 29 2025
Sharon, CT
Bid Date: Jul 19 2024
Sharon, CT
Bid Date: May 31 2023
Sharon, CT
Bid Date: Aug 12 2022
Norwich, CT
Bid Date: Feb 04 2026
Hartford, CT
Bid Date: Feb 11 2026
Wallingford, CT
Bid Date: Jan 29 2026
Stamford, CT
Bid Date: Feb 05 2026
Norwalk, CT
Bid Date: Jan 16 2026
RFP Design - Enfield Station TOD Public Roadway Enhancements - Planning And Design Updates - 6000965
Enfield, CT
Bid Date: Feb 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
