Published February 2, 2026 at 7:00 PM

Updated February 3, 2026

Site work and paving for a mixed-use development in Farley, Iowa. Completed plans call for site work for a road / highway; water / sewer project; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Construct 3rd Avenue SW Reconstruction project including all labor, materials, and equipment necessary for clearing and grubbing; removal and installation of PCC curb and gutter, PCC sidewalk and driveways, 7" PCC Pavement, HMA wedge and driveways; removal of existing pipe and structures; abandonment of sanitary sewer and water main; installation of PVC sanitary sewer (8"-10") and manholes, RCP storm sewer (12"-36"), RCAP storm sewer, storm intakes, subdrain, PVC water main (4"-8"), DIP water main (8"), hydrants, valves; traffic control; erosion control; SWPPP preparation and management; seeding; testing; and miscellaneous associated work including cleanup. All proposals and bids shall be submitted to the City Clerk on official bidding blanks furnished by the City. Each proposal must be sealed and identified, and must be accompanied by bid security in the amount of five percent (5%) of the bid, in the form of a certified check, cashier's check, certified share draft, or bid bond. The successful bidder will be required to furnish a bond in the amount of 100% of the contract price, guaranteeing faithful performance and prompt payment for materials and labor, and guaranteeing the work against faulty workmanship and materials for four years after completion and acceptance. Contractors and subcontractors must obtain tax exemption certificates from the City for this project. Work must commence within ten days of the Notice to Proceed. All work, with the exception of seeding, must be completed by November 20, 2026, and all remaining work by March 31, 2027, unless extended by the City Council. If Alternate Bids are awarded, all work shall be completed by August 20, 2027. Liquidated damages of $500 per calendar day will be assessed for uncompleted work past the contract period, subject to extensions granted by the City Council. All bidders must submit a fully completed Bidder Status Form as an essential attachment to the Proposal. The City reserves the right to reject any or all bids, to waive informalities, and to enter into such contracts as deemed in its best interest. Bid Result - Base Bid PCC - Top Grade Excavating, Inc. - $ 3,119,548.81 Base Bid HMA - Top Grade Excavating, Inc. - $ 3,122,997.31

Bid Results

Roads / Highways

$6,242,546.00

Public - City

Paving, Site Work

239

6

5

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
153
Bidding Soon
951
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2026

March 30, 2026

Project location map

3rd Ave SW, Farley, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.