Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 28, 2026 at 7:00 PM
Updated January 31, 2026
Site work and new construction of an office development in Edmonton, Alberta. Completed plans call for the construction of a 1,912-square-foot, 0-story below grade office development.
The project site is located within Sturgeon County, Alberta at CFB Edmonton. The Edmonton CAF TC will provide support to all CAF members, regular and reserve forces, in Alberta. The Construct Transition Centre project will deliver new infrastructure to accommodate the CAF TG organization at 3 CDSB Edmonton in one centralized location. The project is intended to house approximately 72 personnel with an estimated total gross floor area of 1,912 m2. The facility will accommodate the staff of the CAF TU AB-North and TC at 3 CDSB Edmonton with identified workspaces, reception areas, as well as individual, group and specialized counselling and therapy spaces. This new infrastructure will enable the CAF TG to effectively administer, sufficiently support, and dutifully assist all transitioning CAF members in the region. This project will achieve Zero Carbon Building (Design and Performance) certifications as well as advanced commissioning requirements. The project involves the construction of a steel-framed office-type building to be delivered as a complete and furnished facility. The building is being planned to achieve a net-zero energy performance objective, relying on fully electric building systems and on-site renewable energy generation. Space heating will be provided by an air-source heat pump system, and the electrical scope will include lighting, power, building controls, and roof-mounted solar photovoltaic panels to support the net-zero target. The building program will include typical office spaces such as enclosed offices, open work areas, meeting rooms, washrooms, and support spaces, with washrooms to be fully outfitted with fixtures and accessories. The scope will include all work required to deliver a fully operational office building and outside landscaping in compliance with applicable codes, energy performance requirements, and owner standards. Further technical and performance requirements will be provided in the formal tender documents. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Deadline 01/23/2026 at 7:00 PM MT
Post-Bid
Office
$500,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 30, 2026
April 1, 2026
CFB Edmonton, Edmonton, AB
Related To This Project
Edmonton, AB
Bid Date: Jan 28 2026
Edmonton, AB
Bid Date: Feb 05 2026
Edmonton, AB
Bid Date: Feb 12 2026
Edmonton, AB
Bid Date: Feb 09 2026
Edmonton, AB
Bid Date: Feb 26 2026
Edmonton, AB
Bid Date: Feb 04 2026
Edmonton, AB
Bid Date: Jan 23 2026
Edmonton, AB
Bid Date: Jan 21 2026
Edmonton, AB
Bid Date: Jan 28 2026
Edmonton, AB
--
Edmonton, AB
--
Edmonton, AB
Bid Date: Jan 07 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
