BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 12, 2026 at 7:00 PM

Updated January 24, 2026

Renovation of an educational facility in Aberdeen, Washington. Completed plans call for the renovation of a educational facility.

For a partial roof repair and replacement at Miller Junior High School. The Board of Directors reserves the right to reject any or all bids, waive informalities, and accept the bid deemed best for the school district. Questions Due: January 16, 2026 | 2:00 PM Estimated Project Total $12,200.00-$14,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Active roof leaks have been identified on the north side of the upper gym roof . Investigation revealed soft roof sheathing and corrosion at nail heads , indicating water intrusion beneath existing shingles . The affected area is approximately 20 feet by 30 feet (600 square feet ) beginning at the eave edge . The roof assembly is believed to include rigid insulation over interior spaces with stepped transitions at overhangs . Concealed rot or damage beneath the insulation may be present and will be evaluated during demolition . SCOPE OF WORK The Contractor shall provide all labor , materials , equipment , and supervision necessary to complete the following work : 4.1 Demolition o Remove and legally dispose of all existing roofing materials within the 20 ' x 30 ' area , including shingles , underlayment , sheathing , rigid insulation , vapor barrier , and associated metal flashing . Following demolition , the exposed deck shall be visually inspected by the District's Representative . 4.2 Vapor Barrier Install new 6-mil polyethylene vapor barrier in all areas receiving new insulation . 4.3 Insulation Install new rigid polyisocyanurate (polyiso ) insulation , like -for -like thickness . 4.4 Roof Sheathing Install new 1/2" CDX plywood roof sheathing , mechanically fastened per code . 4.5 Underlayment o o Install Malarkey 401 Ice & Water Shield at both eave edges . Install ASTM - rated synthetic underlayment integrated with existing roofing . 4.6 Sheet Metal Flashing . Install 24 -gauge Kynar 500 eave flashing . o Install 24 -gauge Kynar 500 end -wall flashing at insulated / non - insulated transitions . 4.7 Composition Roofing o Install starter course at eave edges . o Install Malarkey Highlander 40 -year composition shingles tied into existing roofing . Hand -nail shingles using hot -dipped galvanized nails (six nails per shingle ). 4.8 Clean -up and Debris Disposal o Clean work area and remove all debris before leaving the work site each day . School will be in session during this project . Clean work area and remove all debris after project completion .

Post-Bid

Educational

$14,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
92
Bidding Soon
996
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2026

February 23, 2026

Project location map

100 East Lindstrom, Aberdeen, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.