BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2026 at 7:00 PM

Updated March 4, 2026

Site work and paving for a mixed-use development in Sturgeon Bay, Wisconsin. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; road / highway; and for paving for a road / highway.

As of March 03, 2026, the project was awarded to Triple P Inc. dba Peters Concrete Company, with an awarded amount of $544,575.15. This work includes 1,214 linear feet of sanitary main and laterals, 1,231 linear feet of water main and laterals, 1,355 linear feet of storm sewer, 3,528 linear feet of curb and gutter removal, 3,885 square feet of concrete sidewalk and driveway removal, 6,895 square yards of asphalt pavement removal, 2,450 cubic yards of unclassified excavation, 2,504 cubic yards of base aggregate (measured in place), along with other miscellaneous items that accompany these types of projects. All concrete work and all asphalt work will be performed by others. Bids must be accompanied by a bid bond equal to at least 5% of the bid amount. The City reserves the right to reject any or all bid proposals or accept the bid proposal most advantageous to the City. No bid proposal shall be withdrawn without the consent of the Board of Public Works for a period of thirty days after the scheduled time of closing bid proposals. If a bid is accepted, the contractor must execute and file the contract and bond forms within ten days after the award of the contract. Prevailing wage rates are not required for this project.

Award

Water / Sewer

$544,575.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
2
Bidding Soon
329
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2026

March 26, 2026

Project location map

Huron St Utah St Woodruff Pl & Area, Sturgeon Bay, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.