BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2026 at 7:00 PM

Updated February 10, 2026

Site work and paving for a road / highway in Sturgeon Bay, Wisconsin. Completed plans call for site work for a road / highway.

Proposals are being solicited for Project 2501B (Asphalt Replacement Program) including mill/removal of 43,353 SY of asphalt pavement, pulverizing 1,969 SY of asphalt pavement, 52,221 SY of base fine grading, placement of 10,672 tons of hot mix asphalt, adjustment of 48 manhole castings, replacement of 45 water valve stem tops, and other miscellaneous associated items. The work covers multiple streets and is scheduled to begin on various dates, with all projects to be completed by September 30, 2026 (weather permitting). Sealed bids are required, accompanied by a bid bond equal to at least 5% of the bid proposal. If awarded, the contract and bond must be executed and filed within ten days. The City reserves the right to reject any or all proposals or accept the one most advantageous to the City. No bid may be withdrawn for thirty days after the scheduled closing time without consent of the Board of Public Works. Prevailing wage rates are not required.

Post-Bid

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
60
Bidding Soon
470
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2026

May 1, 2026

Project location map

To be determined, Sturgeon Bay, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.