Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 27, 2026 at 7:00 PM
Updated January 28, 2026
Site work for a military facility in Bluffdale, Utah. Completed plans call for site work for a military facility.
All questions regarding this solicitation must be submitted through online Platform on or before January 15, 2026 at 5:00 pm (MST). Contractor Selection (Estimated) January 23, 2026 The scope of services shall include, but not be limited to, the following: 1. Site Evaluation and Pad Location: Conduct a comprehensive evaluation of the Development Area and propose the optimal location for the Pad Site, based on topography, access, and utility feasibility. 2. Finished Grade Determination: Develop and propose finish grades for the Pad Site to achieve a finish-grade, build-ready condition suitable for industrial development. 3. Access Route Evaluation: Evaluate and propose access routes to the Pad Site that support construction activities and future operational needs. 4. Mobilization and Demobilization: Mobilize and demobilize all necessary equipment, crews, and materials required to complete the work. 5. Site Preparation: Clear the site, including removal of vegetation and stripping of topsoil as needed to support excavation and grading activities. 6. Mass Excavation: Perform all required mass excavation, including cutting, trenching, and fill operations necessary to achieve the proposed finished grades. 7. Finish Grading: Conduct finish grading to meet specific slopes, contours, and tolerances as outlined in the contractor's proposal and approved by MIDA. 8. Road and Infrastructure Protection: Maintain and protect temporary access roads, haul routes, and adjacent infrastructure throughout the duration of the project. 9. Water and Dust Control: Implement on-site water and dust control measures in compliance with MIDA, Camp Williams, and applicable military standards. 10. Material Handling: Material handling shall comply with the Proposer's proposed soil management and balancing strategy, including the loading, transporting, and management of all excavated materials. 11. Environmental Compliance: Ensure compliance with all environment requirements, including erosion control, storm water management, and site stabilization throughout the project. 12. Permitting and Clearances: Secure all necessary on-base clearances, State UPDES permits, Stream Alteration permits, and any other required authorizations. 13. Coordination with Military Personnel: Coordinate with MIDA, Camp Williams, and Utah National Guard personnel for site access, scheduling, and operational requirements. 14. Safety and Security Compliance: Adhere to all applicable federal, state, and military safety, security, and operational protocols. 15. Coordination with External Agencies: Coordinate with Utah Department of Transportation ("UDOT"), utility providers, and other relevant agencies to ensure alignment with existing and future infrastructure. Proposers are invited to submit a proposal that includes the design and installation of utility stub-outs to the perimeter of the Pad Site. If the Proposer elects to propose this service and MIDA subsequently exercises its option to include this work in the final agreement, the scope of work shall include: 1. Install utility infrastructure in accordance with the specifications of the respective utility provider and any standards from Camp Williams. 2. Cap, seal, and clearly mark all utility stubs at the pad's boundary for future connection. 3. Provide detailed drawings and GIS data points showing the exact location, depth, and material of all installed utility lines and stub-out termination points.
Award
Military
$2,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 20, 2026
February 2, 2026
17800 1700 W, Bluffdale, UT
Related To This Project
Bluffdale, UT
Bid Date: Feb 11 2026
Bluffdale, UT
Bid Date: Mar 02 2026
Bluffdale, UT
Bid Date: Jan 15 2026
Bluffdale, UT
Bid Date: Dec 15 2025
Bluffdale, UT
--
Bluffdale, UT
Bid Date: Nov 18 2025
Bluffdale, UT
Bid Date: Oct 13 2025
Bluffdale, UT
Bid Date: Sep 24 2025
Bluffdale, UT
Bid Date: Sep 15 2025
Bluffdale, UT
Bid Date: Aug 11 2025
Bluffdale, UT
Bid Date: Aug 12 2025
Bluffdale, UT
Bid Date: Aug 14 2025
Bluffdale, UT
Bid Date: Aug 07 2025
Bluffdale, UT
Bid Date: Jun 24 2025
Bluffdale, UT
Bid Date: May 30 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
