Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 20, 2026 at 7:00 PM
Updated January 21, 2026
Site work for a civil project in Miami Beach, Florida. Completed plans call for site work for a water / sewer project.
Reference Number 0000409048 Wastewater Pump Station No. 30 (hereafter PS 30) is a submersible type station located on Terminal Island. PS 30 discharges to Pump Station No. 2 (hereafter PS 2) located on Star Island, via approximately 3,300 linear feet of 10-inch ductile iron (hereafter DI) force main. A failure occurred on a segment of the 10-inch force main that crosses under the MacArthur Causeway through a concrete pipe chase for electrical conduits. To mitigate this issue and restore service, the City of Miami Beach (The City) installed an emergency above-ground temporary HDPE bypass system. The bypass runs from PS30 northward under the MacArthur Causeway bridge, westward along the seawall parallel to the MacArthur Causeway, northward along Bridge Road, and reconnects to the existing10-inch force main at a valve at the southern end of Star Island. The City intends to locate the existing 10-in force main and rehabilitate the subaqueous portion through Cured-in-Place-Pipe (CIPP) lining. The scope of work includes the initial assessment, cleaning, lining, and post-installation assessment of about 694 linear feet of a 10-inch DI pipe along Bridge Rd from the MacArthur Cswy to the southern end of Star Island. The Work outlined in the Contract Documents includes the furnishing of all labor, materials, equipment, services, and incidentals necessary to complete the required work described here including all appurtenant work, complete, tested, and ready for operation, including temporary utilities and facilities as required, all surveying work for layout construction and asbuilts, all in conformance with these Contract Documents and City of Miami Beach Public Works Standards. Bonding Requirements - Bid Bond 5 % Question Deadline 02/12/2026 at 5:00 PM ET Questions are submitted online Yes, Questions will be allowed up to 15 days before the initial deadline for submittal of Bids. Questions must be directed to Julissaperez@miamibeachfl.gov, with a copy sent to the City Clerk rafaelgranado@miamibeachfl.gov.
GC Bidding
Water / Sewer
$1,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 26, 2026
March 30, 2026
MacArthur Cswy & Bridge Rd, Miami Beach, FL
Related To This Project
Miami Beach, FL
Bid Date: Feb 03 2026
Miami Beach, FL
Bid Date: Jan 27 2026
Miami Beach, FL
--
Miami Beach, FL
Bid Date: Jan 15 2026
Miami Beach, FL
Bid Date: Feb 02 2026
Miami Beach, FL
Bid Date: Jan 22 2026
Miami Beach, FL
Bid Date: Jan 14 2026
Miami Beach, FL
Bid Date: Feb 02 2026
Miami Beach, FL
Bid Date: Jan 21 2026
Miami Beach, FL
Bid Date: Jan 07 2026
Miami Beach, FL
Bid Date: Nov 20 2025
Miami Beach, FL
Bid Date: Nov 14 2025
Miami Beach, FL
--
Miami Beach, FL
Bid Date: Dec 03 2025
Miami Beach, FL
Bid Date: Nov 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
