Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 6, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of a playground / park / athletic field in Glendo, Wyoming. Completed plans call for the renovation of a playground / park / athletic field; and playground / park / athletic field.
The project consists of replacement of six existing comfort stations and installation of one new comfort station at Glendo State Park. Only bids submitted through the Public Purchase site and on State of Wyoming forms will be considered. It is the bidder's responsibility to review the Public Purchase website for answers to questions, addenda, or bid tabulations. All bids must be signed and uploaded completely through the Public Purchase online bidding system by the deadline. If a bid is greater than $150,000, each bid is required to have a bid deposit in the amount of ten percent (10%) of the total bid, which shall be in the form of a bid bond, cashier's check, or certified check (no personal checks will be accepted), or an electronic bid bond with Surety 2000. Original bid bonds or cashier checks must be received in the Procurement Office by the deadline if not using Surety 2000. Activation of registration may take up to 24 hours, so interested parties should register immediately to avoid delays. Question Deadline 01/29/2026 at 11:00 AM MT time change from 1:00 PM MT as per spec. Bidding questions shall be submitted on the Public Purchase website by All questions will be answered and provided to all prospective bidders via answers on the Public Purchase website or in the form of a written addendum posted on Public Purchase by 3:00 p.m. MT on February 9, 2026. Questions received after 11:00 AM Mountain Time on January 29, 2026, will not be addressed The targeted substantial completion dates are as follows: Substantial Completion Date: May 20th, 2026. Includes completion of ALL work items except seeding. For the purpose of assessing liquidated damages, the project Final Completion dates are as follows: Final Completion Date: June 18th, 2026. This project will consist of replacement of six existing comfort stations and installation of one new comfort station. Estimated Project Completion date is: June 18, 2026 A Pre-Bid Meeting will be held as follows: Not required; the questions and clarifications process will be used exclusively to identify questions and offer published clarifications and/or issue addenda. Work includes but may not be limited to the following: installation of one new restroom vault (elkhom site), and includes clearing and grubbing ofvegetation, grading, installation of gravel and concrete surfacing, striping, signage, and fencing. Removal and replacement of existing comfort stations (all other sites), and includes pmnping of existing vaults, demolition and removal of existing vaults and vault structures (above and below grade), surfacing, fencing, signage, minor topsoil stripping, placement and seeding. Installing new restroom vaults, minor grading, installation of gravel and concrete surfacing, striping, signage, and fencing. All construction debris generated from work shall be disposed of at contractors offsite locations per section 02050. Note that no disposal sites are available or acceptable at state parks facilities. All work is to be completed per the project plans.
Award
Playgrounds / Parks / Athletic Fields
$1,000,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2026
April 1, 2026
Multiple Locations, Glendo, WY
Related To This Project
Glendo, WY
Bid Date: May 26 2026
Glendo, WY
Bid Date: May 26 2026
Glendo, WY
Bid Date: Apr 16 2025
Glendo, WY
Bid Date: Apr 24 2025
Glendo, WY
Bid Date: Dec 19 2024
Glendo, WY
--
Glendo, WY
Bid Date: Feb 08 2024
Glendo, WY
Bid Date: Jan 12 2024
Glendo, WY
Bid Date: Oct 06 2021
Glendo, WY
Bid Date: Aug 17 2023
Glendo, WY
--
Glendo, WY
Bid Date: Jul 17 2019
Glendo, WY
Bid Date: Mar 07 2019
Mills, WY
Bid Date: Jan 23 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
