BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2026 at 7:00 PM

Updated January 29, 2026

Renovation of a mixed-use development in South Salt Lake, Utah. Completed plans call for the renovation of a clubhouse / community center.

**Per Addendum 1 the bid date has been extended from 01/23/26 to 01/28/26** The project is titled "South Salt Lake Community Center Auditorium Audio and Visual System Upgrade." Services will include audio and video installation and upgrades to the Community Center. Proposals must be submitted as a single PDF. Submissions that are late, incomplete, or do not meet submission format and contents as described will not be accepted. The City reserves the right to reject all submissions or to waive any informality in any submissions if deemed in the best interest of the City. There is no guarantee that a contract will be awarded following the submission deadline. Questions Due Date: Jan 21st 2026, 5:00 PM MST o All speakers replaced o 23 Speakers in 3 zones o 2-4 New speakers for music or other events o 2 Projectors replaced o 1 Projector screen replaced o PTZ camera for City events o Assisted listening system o 2 Touch controllers o Code for interaction o Way to export both audio and video to a computer for streaming and recording o No need for a local recording/streaming system o Way for a DJ or other professional to use the speakers but bypass the rest of the system Detailed Overview Stage Upgrade o 4 Speakers replaced o In standard ceiling tile o 2 Larger, high quality speakers for music o 1 Projector o Will require a long throw lens o 1 Projector screen o Image will be projected from the rear o 2 Wireless handheld mics o 2 Wireless Lapel mics o PTZ camera o Minimum 30x zoom o Audio rack is located to the side of the stage for holding all equipment o Assisted listening system o Export Audio and video o HDMI input in rack o HDMI input under stage o Exact location to be determined at time of install o 1 Touch controller o Needs to control both projectors/screens o Exact location to be determined at time of install Auditorium Upgrade o 15 Speakers replaced o Around 4 inches of space available above each speaker o Conduit ran between speakers and rack o Lift will be provided o 1 projector replaced o Current screen is in good condition and doesn't need to be replaced o 1 Touch controller o Needs to control both projectors/screens o Exact location to be determined at time of install o HDMI input around touch controller location o Conduit is ran back to rack from location of current controller Hall Upgrade o 4 Speakers replaced o In standard ceiling tile o Path from rack to speakers is unknown and may require drilling through brick wall o Hall speakers need to be on separate channel from the rest of the speakers

Post-Bid

Clubhouse / Community Centers

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2026

February 23, 2026

Project location map

To be determined, South Salt Lake, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.