BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 17, 2026 at 7:00 PM

Updated January 18, 2026

Site work and new construction of a mixed-use development in Champaign, Illinois. Completed plans call for the construction of a sidewalk / parking lot; and playground / park / athletic field.

The work consists of the installation of a new concrete basketball court and ADA sidewalk at Johnston Park, 701 Goldenview Drive, Champaign IL 61821, per provided specifications. Work includes all labor, supervision, and appropriate equipment for park development, including grading, landscaping, concrete work, furnishing, and playground installation. Site work is limited to the development area as shown on bid drawings and addenda. The contractor must practice stormwater and erosion best practices, keep the site clean during the course of work, dispose of debris off-site, exhibit heightened security and safety practices, and limit activity outside the work area to minimize soil compaction. Grading and site restoration require maximizing cut/fill ratios, ensuring positive drainage, and obtaining district approval of rough grades before proceeding. Seeding, rough grading, concrete work (including excavation, base preparation, forming, placing, finishing, jointing, and curing), finish grading, striping, and installation of goals are included in the scope. The work must comply with all federal, state, and local regulations, prevailing wage requirements, and affirmative action practices. Submission of required forms and bonds are stipulated. Bidders must inspect the location prior to bidding and submit their bids in accordance with specified instructions for bid form completion, packaging, and required documentation. Questions and comments regarding this solicitation should be directed to Andrew Weiss, Planner, at Bresnan Meeting Center, 706 Kenwood Road, Champaign, Illinois 61821 or by calling (217) 819-3822 or by email at andrew.weiss@champaignparks.org, Inquiries must be received by 3 pm prevailing time on Fri 25 Jul 2025

Sub-Bidding

Playgrounds / Parks / Athletic Fields

$100,000.00

Public - City

New Construction, Site Work

4

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
92
Bidding Soon
970
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2026

March 2, 2026

Project location map

701 Goldenview Dr, Champaign, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.