BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2026 at 8:00 PM

Updated March 26, 2026

Site work for a pipeline in Lethbridge, Alberta. Design plans call for site work for a pipeline.

Uplands and Garry Drive Transmission Line Twinning - installation of approx. 2.7 km of new transmission main extending from the Water Treatment Plant to a connection with the existing fill main south of Hwy 3. TIMELINE: Planning and design work to commence shortly. Construction is expected to be completed in late 2028. Scope of work and project schedules may be reconfirmed mid-2026.

Design

Pipeline

$14,656,200.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
0
Bidding Soon
98
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2027

Project location map

Multiple Locations, Lethbridge, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.