Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 5, 2026 at 7:00 PM
Updated February 6, 2026
Site work for a municipal facility in Summerville, South Carolina. Completed plans call for site work for a municipal facility.
Questions or clarifications concerning this invitation should be posted to the solicitation on the OpenGov Procurement portal or directed by email to only Rebecca Dantzler at RDantzler@DorchesterCountySC.gov. The last day and time for submittal of written questions shall be no later than Thursday, February 12, 2026 at 8:00 am. Term of Agreement Substantial completion must be achieved within two-hundred and ten (210) calendar days from Notice to Proceed. Final completion must be achieved within thirty (30) calendar days thereafter. Bid Security Any bid over $25,000 must be accompanied by a bid bond acceptable to the County. Bid bonds must be issued by a corporate surety registered and authorized to do business in the State of South Carolina. Bid bonds shall be payable to the County, shall be for at least five (5%) percent of the total amount of the bid, and shall serve as a guarantee deposit that the bid will be carried out to the complete satisfaction of the County. In lieu of a bond, Bidder may submit a certified check or cashier's check in aforesaid amount payable in U.S. funds. General Description The Contractor shall furnish all labor, tools, materials, equipment, and supervision necessary to complete the Work found in Attachment A (Specifications_Miles Jamison Solid Waste Convenience Site Expansion) and Attachment B (Drawings_Miles Jamison Solid Waste Convenience Site Expansion) and as according to the terms and conditions found in the entire solicitation document. Work to be performed under this Contract includes, but is not limited to, constructing a solid waste convenience center that consists of the following: prefabricated attendant building, cast in place concrete retaining walls, paved areas (concrete and asphalt), yard waste and waste tire stockpile areas, utilities (electrical, water, sewer) and erosion control devices (sediment basin, channels, and culverts) and all other Work required in accordance with the Contract Documents. Notice of Award: February 20, 2026 Substantial Completion: 210 Calendar Days Final Completion: 240 Calendar days
GC Bidding
Municipal
$820,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 24, 2026
March 26, 2026
130 Suburban Ln, Summerville, SC
Related To This Project
Summerville, SC
--
Summerville, SC
Bid Date: Feb 26 2026
Summerville, SC
--
Summerville, SC
--
Summerville, SC
--
Summerville, SC
Bid Date: Feb 24 2026
Summerville, SC
Bid Date: Mar 06 2026
Summerville, SC
Bid Date: Dec 17 2020
Summerville, SC
--
Summerville, SC
Bid Date: Dec 17 2025
Summerville, SC
Bid Date: Dec 04 2025
Summerville, SC
Bid Date: Dec 02 2025
Summerville, SC
Bid Date: Dec 04 2025
Summerville, SC
Bid Date: Nov 20 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
