Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 15, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in High River, Alberta. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

BF75054-1 Major Bridge Replacement, Grading, Granular Base Course (GBC), Asphalt Concrete Pavement (ACP) and Other Work. Carrying Hwy 23:08 Over Hwy 2:12, 1 KM East of High River (SW 4-19-28-W4M) - (Construction WAC0010515). TIMELINE: Planning and design work to commence shortly. Construction is tentatively planned for 2029. *Budget is unreleased.

Design

Bridges / Tunnels

$14,000,000.00

Public - State/Provincial

Paving, Site Work

50

9

16

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
32
Bidding Soon
557
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2029

Project location map

AB-23, High River, AB


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed