BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Demolition, site work, paving and new construction of a mixed-use development in Bellingham, Washington. Completed plans call for the construction of a 18,200-square-foot, three-story above grade, 38-unit multi-residential development; for the demolition of a two-story above grade multi-residential development; for site work for a multi-residential development; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The proposed project, supporting Lake Whatcom Residential & Treatment Center, includes the demolition of two existing four-plex structures located on the Property and the construction of a new 38-unit, 3 story studio apartment building, with associated parking, landscaping, garbage, site and utility improvements. The proposed building will have R2 occupancy and Type V-A construction, with approximately 18,200 square feet of gross floor area. The project is being designed for sustainability to the Evergreen Sustainable Development Standard (ESDS) and state requirements. Deadline for Pre-Bid Questions & Substitution Requests: 01/27/2026 at 2:00 PM . Anticipated Start Construction: March 2026 . Anticipated Substantial Completion: March 2027 . Trade Contractors shall have an active and valid contractors license in the State of Washington and not be debarred from working on federally funded projects or state funded projects. . State funds require Washington State Commercial Prevailing Wage Rates (Residential). . Faber Construction and LWRTC are both Equal Opportunity providers and employers and encourage participation from WBE, DBE, MBE and emerging small business subcontractors and suppliers. All bid and project related questions must be directed in writing to: - Jeff Johnson, Preconstruction Manager | Faber Construction, jeffJ@faberconstruction.com - And CC: Faber Estimating | Bids@faberconstruction.com

Post-Bid

Multi-Residential

$7,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
151
Bidding Soon
2,673
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

March 5, 2026

Project location map

1436 Lincoln St, Bellingham, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.