Published February 25, 2026 at 7:00 PM

Updated February 26, 2026

Site work and paving for a road / highway in St. James, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Charlevoix County Road Commission invites qualified contractors to bid the following road work: A. Freesoil Avenue: 530 feet of grading, 22A aggregate, bituminous paving, shoulders, and restoration. B. Maple Street: 845 feet of grading, 22A aggregate, bituminous paving, shoulders, and restoration. Both roads are county local roads in St. James Township. Bidders must use Road Commission furnished forms available at the main office, with bids plainly marked as to contents and submitted at the main office before the scheduled bid opening. PROJECT LOCATION (see enclosed map) Freesoil Ave. (530-FT) - Main St. North 530-FT to pavement end. Maple St. (845-FT) - Main St. to Lake Dr. (entire length) Freesoil Ave. (530-FT) - Contractor shall grade outward from existing 18-FT bituminous roadway 2-FT each side (a cleanup cut) to accommodate new 2-FT 23A gravel/topsoil shoulders. Contractor shall sweep existing 18-FT bituminous roadway prior to paving. A 4EL, Mod. Bituminous wedge shall be placed first from the centerline outward to existing bituminous edge to maintain the 18-FT pavement width, followed by a 165#/SYD bituminous overlay resulting in a final 3.5-Inch minimum outside edge pavement thickness. New 2-FT 23A gravel/topsoil shoulders shall consist of field blending new 23A aggregate and topsoil; final shoulder stabilization shall be grass/fertilizer mix, as shown on the Typical Cross Section. Other work includes Freesoil Avenue pavement removal (from Main St. approach North 100-FT), sidewalk removal and replacement, gravel driveway restoration, and restoration. Maple Street (845-FT) - The Contractor shall grade the existing gravel road to the proposed cross section to accommodate a 24- FT wide new aggregate base. A miscellaneous 22A Aggregate quantity is included for any necessary grade adjustments. A 4EL, Mod. Bituminous pavement (330#/SYD total in two equal lifts) shall be placed to a final 22-FT pavement width. New 1-FT 23A gravel/topsoil shoulders shall consist of field blending new 23A aggregate and topsoil; final shoulder stabilization shall be grass/fertilizer mix, as shown on the Typical Cross Section. Bid result - Freesoil Avenue (530-FT): Rieth-Riley Const. Company $75,432.20 Maple St. (845-FT): Rieth-Riley Const. Company $90,536.40

Award

Roads / Highways

$165,968.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
1
Bidding Soon
160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

March 5, 2026

Project location map

Multiple Locations, St. James, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.