BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2026 at 8:00 PM

Updated March 15, 2026

Renovation of an educational facility in New Ellenton, South Carolina. Completed plans call for the renovation of a educational facility.

Painting at Greendale Elementary. Bids are being accepted for the "2025-2026 Painting of Greendale Elementary School." Sealed bids are to be received at the Facilities Construction Department of the Aiken County Public Schools Operations Center. Performance and Labor/Materials (Payment) Bonds along with notarized Power of Attorney are required. Specifications can be obtained from the Facilities Construction Department or requested by email or phone. There will be a mandatory pre-bid meeting at the school. All contractors must inspect the individual schools by contacting the designated person for an appointment after the pre-bid meeting. Sign-in sheets will be at the main office of the school. A Bid Bond or Certified Check for five percent (5%) of the base bid is required. A valid Certificate of Insurance must be submitted with the bid. The Owner reserves the right to reject any or all bids and to waive technicalities and formalities. No bid may be withdrawn for a period of sixty (60) days after opening. Addendums and additional information may be found on the specified website under Facilities Construction Bid solicitations. Question Deadline 02/12/2026 at 11:00 AM ET All Contractors will be required to inspect the individual schools by contacting Jeremiah Jones, (803) 645-9084 or jjones2@acpsd.net for a predetermined appointment after this meeting. Sign in sheets will be available at the main office of the schools. July 14, 2026 Substantial Completion Date This section includes surface preparation, painting and finishing of exposed interior/exterior items and surfaces. A. Surface preparation priming and finish coats specified in this section are in addition to shop priming and surface treatment specified under other sections. A. Paint exposed surfaces whether or not colors are designated in "schedules", except where a surface or material is specifically indicated not to be painted or is to remain natural. Where an item or surface is not specifically mentioned, paint the same as similar adjacent materials as surfaces. If color or finish is not designated, the Owner will select from standard colors or finishes available. B. All surfaces are to receive one (1) coat of bonding primer, and one (1) finish coat of Pre-Catalyzed Water based Semi-Gloss Epoxy Extra paint sufficiently to cover all paint surfaces unless otherwise listed. Sheetrock will receive one (1) primer coat and one (1) finish coat of eggshell latex paint (check with Facilities Construction at Aiken County)

Award

Educational

$134,490.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
0
Bidding Soon
467
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

March 23, 2026

Project location map

505 S Boundary Ave, New Ellenton, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.