BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2026 at 7:00 PM

Updated February 19, 2026

Site work and paving for a mixed-use development in Farmington Hills, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

1.70 mi of concrete pavement reconstruction, pavement repairs, drainage improvements, concrete curb and gutter, concrete sidewalk ramps, and permanent pavement markings on Halsted Road from 12 Mile Road to south of 14 Mile Road in the city of Farmington Hills, Oakland County. This is a Local Agency project. 6% Sbp Participation Required Net classification required for this project is 2897 B or 2897 Ea In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. MIDOT - 2602 041 - Concrete Pavement Reconstruction, Pavement Repairs, Drainage Improvements, Concrete Curb and Gutter, Concrete Sidewalk Ramps, and Permanent Pavement Markings on Halsted Road

Award

Roads / Highways

$2,281,200.00

Public - State/Provincial

Paving, Site Work

80

7

14

6

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
2
Bidding Soon
1,484
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2026

April 15, 2026

Project location map

Halsted Rd, Farmington Hills, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.