BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2026 at 8:00 PM

Updated April 3, 2026

Site work and paving for a mixed-use development in Miami, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive Bids and Proposals from Proposers for the design and construction of Wrong-Way Driving (WWD) Advanced Countermeasures at various Interchange Exit Ramps in Miami-Dade County. In accordance with FDOT's WWD initiative, the following 21 ramps have been identified for implementation of WWD countermeasures: SR 826/Palmetto Expressway NB off-ramp to SR 94/Kendall Dr/SW 88 Street SR 826/Palmetto Expressway NB off-ramp to SR 986/Sunset Dr/SW 72nd Street SR 826/Palmetto Expressway NB off-ramp to Miller Dr/SW 56 Street SR 826/Palmetto Expressway NB off-ramp to SR 90/SW 8 Street SR 826/Palmetto Expressway NB off-ramp to SR 934/NW 74 Street SR 826/Palmetto Expressway SB off-ramp to NW 154 St/Miami Lakes Dr. SR 826/Palmetto Expressway EB off-ramp to NW 67 Avenue SR 826/Palmetto Expressway EB off-ramp to SR 823/NW 57 Avenue SR 826/Palmetto Expressway WB off-ramp to SR 823/NW 57 Avenue SR 826/Palmetto Expressway EB off-ramp to SR 817/NW 27 Avenue SR 826/Palmetto Expressway WB off-ramp to SR 817/NW 27 Avenue I-75/SR 93 SB off-ramp to SR 860/NW 186 St (Exit 4) SR 9A/I-95 SB off-ramp to S. Miami Ave (Exit 2C) SR 970/EB Downtown Distributor EB off-ramp to SE 1 Ave and SE 2 Ave (Exit 2A) SR 9A/I-95 NB off-ramp to NW 2 Street (Exit 2B) SR 112/I-195 EB off-ramp to North Miami Avenue (Exit 2A) SR 9A/I-95 NB off-ramp to SR 932/NW 103 Street SR 9A/I-95 Express Lane NB off-ramp to Golden Glades Parking Lot SR 826/NW 7th Avenue Extension EB off-ramp to US 441/SR 7/NW 2nd Avenue SR 856/William Lehman Cswy EB off-ramp to EB Loop to East Country Drive SR 856/William Lehman Cswy EB off-ramp to SR A1A/Collins Avenue Question Deadline 03/18/2026 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online.

Post-Bid

Roads / Highways

$8,819,713.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
7
Bidding Soon
1,304
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.