Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 2, 2026 at 8:00 PM
Updated April 3, 2026
Site work and paving for a mixed-use development in Miami, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive Bids and Proposals from Proposers for the design and construction of Wrong-Way Driving (WWD) Advanced Countermeasures at various Interchange Exit Ramps in Miami-Dade County. In accordance with FDOT's WWD initiative, the following 21 ramps have been identified for implementation of WWD countermeasures: SR 826/Palmetto Expressway NB off-ramp to SR 94/Kendall Dr/SW 88 Street SR 826/Palmetto Expressway NB off-ramp to SR 986/Sunset Dr/SW 72nd Street SR 826/Palmetto Expressway NB off-ramp to Miller Dr/SW 56 Street SR 826/Palmetto Expressway NB off-ramp to SR 90/SW 8 Street SR 826/Palmetto Expressway NB off-ramp to SR 934/NW 74 Street SR 826/Palmetto Expressway SB off-ramp to NW 154 St/Miami Lakes Dr. SR 826/Palmetto Expressway EB off-ramp to NW 67 Avenue SR 826/Palmetto Expressway EB off-ramp to SR 823/NW 57 Avenue SR 826/Palmetto Expressway WB off-ramp to SR 823/NW 57 Avenue SR 826/Palmetto Expressway EB off-ramp to SR 817/NW 27 Avenue SR 826/Palmetto Expressway WB off-ramp to SR 817/NW 27 Avenue I-75/SR 93 SB off-ramp to SR 860/NW 186 St (Exit 4) SR 9A/I-95 SB off-ramp to S. Miami Ave (Exit 2C) SR 970/EB Downtown Distributor EB off-ramp to SE 1 Ave and SE 2 Ave (Exit 2A) SR 9A/I-95 NB off-ramp to NW 2 Street (Exit 2B) SR 112/I-195 EB off-ramp to North Miami Avenue (Exit 2A) SR 9A/I-95 NB off-ramp to SR 932/NW 103 Street SR 9A/I-95 Express Lane NB off-ramp to Golden Glades Parking Lot SR 826/NW 7th Avenue Extension EB off-ramp to US 441/SR 7/NW 2nd Avenue SR 856/William Lehman Cswy EB off-ramp to EB Loop to East Country Drive SR 856/William Lehman Cswy EB off-ramp to SR A1A/Collins Avenue Question Deadline 03/18/2026 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online.
Post-Bid
Roads / Highways
$8,819,713.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 30, 2026
November 30, 2026
Multiple Locations, Miami, FL
Related To This Project
Miami, FL
--
Miami, FL
Bid Date: Jan 26 2026
Miami, FL
--
Miami, FL
Bid Date: Feb 26 2026
Miami, FL
Bid Date: Feb 02 2026
Miami, FL
Bid Date: Feb 27 2026
Miami, FL
--
Miami, FL
Bid Date: Feb 13 2026
Miami, FL
Bid Date: Mar 25 2026
Miami, FL
--
Miami, FL
Bid Date: Feb 25 2026
Miami, FL
Bid Date: Feb 09 2026
Miami, FL
Bid Date: Jan 30 2026
Miami, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
