Updated March 13, 2026

Demolition, site work and new construction of a water / sewer project in Hermitage, Pennsylvania. Completed plans call for the demolition of a water / sewer project.

The Hermitage Municipal Authority will receive sealed bids online for the Pine Hollow Pump Station Replacement project. Bids may be submitted and updated online until 10:00 AM on March 24, 2026. A certified check or bid bond for the amount of 10% of the total bid shall be required, issued by a surety licensed to do business in the Commonwealth of Pennsylvania. Interested bidders need to register at the PennBID website. Once registered, bidders can obtain all project documents and submit and update their bids online. Bids shall remain open for a period of 60 days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. Bids may not be withdrawn during this period. All Bidders must bid on all items listed on the Bid Form. The successful Bidder shall be required to furnish performance and payment bonds in the amount of 100% of the Contract Price. The successful Bidder shall substantially complete the project within 300 calendar days of receipt of the Notice to Proceed. This contract is subject to the Pennsylvania Prevailing Wage Act conditions, the Federal Occupational Safety and Health Act of 1970 (OSHA) conditions, the Pennsylvania Act 229 of 2002, the Pennsylvania One Call Act (Underground Utility Line Protection Law), the Pennsylvania Human Relations Act 222 Conditions, the non-discrimination in Employment/Contract Compliance Regulations, requirement of a Non-Collusion Affidavit, and the Pennsylvania Public Works Employment Verification Act. The Hermitage Municipal Authority reserves the right to accept or reject any or all Bids. Question Deadline 03/10/2026 at 4:00 PM ET All questions about the meaning or intent of the Contract Documents are to be directed to Engineer through the online website and interface. Questions received less than 10 days prior to the date for opening of Bids may not be answered. The project involves: 1. Demolition of the existing Pine Hollow Pump Station, including all associated structures, and construction of a new triplex submersible pump station wet well, valve vault, and control building with associated piping, valves, electrical equipment, controls, and site improvements to provide a complete and fully functional pump station capable of conveying the specified design capacity. The work shall be performed in a phased manner to maintain continuous operation of the existing station and shall include all startup, testing, and commissioning required for full operational readiness. 2026-01 General Construction-Demolition of the existing Pine Hollow Pump Station, including all associated structures, and construction of a new triplex submersible pump station with associated piping, valves, electrical equipment, controls, and site improvements to provide a complete and fully functional pump station capable of conveying the specified design capacity. The work shall be performed in a phased manner to maintain continuous operation of the existing station and shall include all startup, testing, and commissioning required for full operational readiness. General contractor will be responsible for furnishing select electrical items including, but not limited to, programable logical controller (PLC), grinder control panel, motorized slide gate equipment, and instrumentation as defined in Divisions 40 and 46. All demolition will be part of the General Construction Contract 2026-02 Electrical Construction- Furnish and install all electrical systems, equipment, and appurtenances required for the complete and fully functional operation of the Pine Hollow Pump Station, including new generator, automatic transfer switch (ATS), disconnects, motor control centers, variable frequency drives, control wiring, and associated conduit, cable trays, and raceways. Work shall include integration with mechanical systems, coordination with existing electrical infrastructure, coordinating temporary and permanent power with the utility provider, and all required testing, startup, and commissioning to ensure reliable operation of all electrical and control systems. Electrical work shall be performed in accordance with applicable codes, standards, and the project phasing requirements to maintain continuous operation of the existing pump station until the new station is fully operational. Electrical Contractor will be responsible for coordinating internet service with current internet provider and providing necessary internet services to the proposed facilities 2026-03 Mechanical Construction- Furnish and install all mechanical systems, equipment, and appurtenances required for the complete and fully functional operation of the Pine Hollow Pump Station, including a ductless split HVAC system, intake louver, and exhaust fan with associated ductwork, dampers, supports, and accessories. Work shall include coordination of mechanical installations with electrical, structural, and architectural trades, and shall provide for equipment access, maintenance clearances, and safe operation. All systems shall be installed, tested, balanced, and commissioned to ensure reliable performance under all anticipated operating conditions. Mechanical work shall comply with applicable codes and standards, manufacturer's recommendations, and the project phasing requirements to maintain continuous operation of the existing pump station until the new facility is fully operational.

GC Bidding

Water / Sewer

$2,620,000.00

Public - City

Demolition, New Construction, Site Work

45

30

4

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
505
Active Projects
285
Bidding Soon
2,490
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

May 25, 2026

Project location map

2801 Lamor Rd, Hermitage, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.