BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2026 at 7:00 PM

Updated February 13, 2026

Renovation of a civil project in E Cleveland, Ohio. Completed plans call for the renovation of a water / sewer project; and water / sewer project.

The work consists of furnishing all labor, materials, equipment, and incidentals for upgrades to various HVAC equipment and systems at the District's Easterly WWTP, Southerly WWTC, Westerly WWTC, Easterly Tunnel Dewatering Pump Station, and EMSC facility. The project involves replacing or upgrading approximately 122 pieces of equipment and/or systems, with the number of improvements summarized by facility as follows: Southerly WWTC: 65, Westerly WWTC: 27, Easterly WWTP: 23, EMSC: 6, Easterly Tunnel Dewatering Pump Station: 1. Bidders shall review all contract documents prior to submitting a bid. Prospective bidders must register for an OpenGov account to access documents and are strongly encouraged to monitor the OpenGov website for updates and addenda. The NEORSD reserves the right to reject any and all Bids, and waive informalities or irregularities. The Contract is subject to NEORSD policies and goals for small business enterprise (SBE) participation, with an SBE goal of 20%. The estimated probable construction cost is $11,400,000. NEORSD will not award a contract for any bid exceeding 20% above the estimated cost. All questions and requests for information must be submitted electronically via OpenGov. Any substantive answers will be distributed as addenda to the bid documents. The Work to be performed under this Contract shall consist of furnishing all tools, equipment, materials, supplies, and manufactured articles; furnishing all labor, transportation, and services, including fuel, power, water, and essential communications; and performing all work or other operations required for the fulfillment of the Contract in accordance with the Contract Documents. The Work shall be complete and operational, and all work, materials, and services not expressly indicated or called for in the Contract Documents which may be necessary for the complete and proper construction of the Work in good faith shall be provided by the Contractor as though originally so indicated, at no increased cost to the Owner. Work Covered by Contract Documents Location: a. Easterly Wastewater Treatment Plant - 14021 Lakeshore Blvd, Cleveland, OH 44110. b. Westerly Wastewater Treatment Plant - 5800 Memorial Shoreway, Cleveland, OH 44102 c. Southerly Wastewater Treatment Plant - 6000 Canal Road, Cleveland, OH 44125 d. Environmental & Maintenance Services Center (EMSC) - 4747 E. 49th Street, Cleveland, OH 44125 e. Easterly Tunnel Dewatering Pump Station (ETDPS) - 786 East 140th Street, Cleveland, OH 44110 Principal Features: a. The project consists of installation of new air handling units and associated equipment at all three wastewater treatment plants, EMSC, and ETDPS. Easterly WWTP 1) Building 07 - Detritor Area i. Provide new natural gas unit heaters 2) Building 14 - Headworks i. Replace existing louver and motor operated damper Principal Features: a. The project consists of installation of new air handling units and associated equipment at all three wastewater treatment plants, EMSC, and ETDPS. Easterly WWTP 1) Building 07 - Detritor Area i. Provide new natural gas unit heaters 2) Building 14 - Headworks i. Replace existing louver and motor operated damper ii. Provide two new exterior air handling units on grade to replace two existing ceiling hung air handling units. iii.Provide new VRF system in Detritor operator office to replace existing RTU. 3) Building 22 - Grease Handling i. Provide three new heating hot water boilers, new NPW filter, new shell and tube heat exchanger, and two new pumps to replace existing NPW water heaters. Westerly WWTP 1) Building 10 - Administration Building i. Replace one RTU ii. Provide new ductwork associated with new RTU. 2) Area 15 - Primary Settling Tanks - B-sump i. Provide new sump steam heating coil ii. Replace existing settling tank hot water spray heads. 3) Building 16 - CSOTF Degrit Building i. Provide new ductless split system 4) Building 20 - Solids Handling Building i. Replace two existing ceiling hung air handling units. ii. Replace existing ceiling recessed fan coil unit and grade mounted condensing unit. iii.Provide new ducted VRF system 5) Building 40 - Maintenance Building i. Replace existing basement AHU ii. Provide boiler room pressure monitor and install new louver. iii.Replace thirteen existing exhaust fans. iv. Replace four existing wall mounted louvers and motor operated dampers Southerly WWTP 1) Building 19A - Access Building C-1 i. Replace one ductless split system 2) Building 30 - Effluent Building i. Remove seven existing exhaust fans ii. Replace three existing roof mounted air handling units. iii.Replace one roof mounted air intake. iv. Replace six roof mounted relief air vents. 3) Building 51A - Grease Unloading Station i. Replace one ceiling hung exhaust fan with one new exhaust fan mounted on grade. 4) Building 58 - CVI Lift Station i. Integrate existing assets into BAS (eleven exhaust fans, two air handling units, on air conditioning unit) ii. Replace one existing roof mounted exhaust fan. 5) Building 70 - Generators Backup & Switchgear Building i. Provide two new ductless split systems. 6) Building 95 - Maintenance Building i. Replace four existing electrostatic precipitator units ii. Provide three new welding fume exhaust systems iii.Provide one new grinder dust collection system iv. Replace sixteen roof mounted exhaust fans. v. Replace one existing mezzanine air handling unit. 7) Substation USS-3 i. Provide two new VRF ductless split systems 8) Substation USS-10 i. Provide two new ductless split systems 9) Substation USS-11 i. Provide two new ductless split systems 10) Substation USS-12 i. Provide two new VRF ductless split systems 11) Substation USS-13 i. Provide two new ductless split systems 12) Substation USS-14 i. Provide two new ductless split systems 13) Substation USS-18 i. Provide two new ductless split systems 14) Substation USS-19 i. Provide two new VRF ductless split systems 15) Substation USS-21 i. Provide two new VRF ductless split systems 16) Southerly Tunnel #3 i. Replace one existing grade mounted exhaust fan EMSC 1) Replace two existing refrigeration evaporator units and associated roof mounted condensing units. 2) Replace 3" chilled water isolation valve and repair chilled water insulation. 3) Replace existing basement air handling unit. 4) Install new VAV box for SWIM area. 5) Install new return grilles route return ductwork to new return grilles in SWIM area. ETDPS 1) Replace existing heating hot water coil in existing AHU-2. C. Contract Documents - Owner shall provide electronic copies of Contract documents and Conformed -to-Contract drawings (native and pdf) and specifications. Printed copies will not be provided by the Owner. D. Work by Others: The Contractor shall coordinate performance of the Work with other Contracts the Owner may execute for work at this site, as required by this and other specifications and the provisions of the General Terms and Conditions Article 11. Keep all drives, access ways, entrances and common areas not specifically identified on the drawings as being occupied by this CONTRACT, free for use by Owner and other Contractors. In the case of disputes regarding the use of the site by this CONTRACT and other Contractors, the Owner will decide which Contract has precedence. Substantial Completion 900 Days from NTP Final Completion 1020 Days from NTP Question Deadline 02/17/2026 at 3:00 PM ET online portal.

Sub-Bidding

Water / Sewer

$11,400,000.00

Public - City

Renovation

195

21

17

8

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
359
Active Projects
198
Bidding Soon
2,004
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2026

April 27, 2026

Project location map

Multiple Locations, E Cleveland, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.