BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Cathedral City, California. Completed plans call for site work for a water / sewer project.

Scope of work: The scope of work consists of furnishing all supervision and labor, materials, necessary equipment and tools, utility work, traffic control and public services coordination required for the completion of the Project. The proposed improvements include the construction of a curb inlet catch basin with a local depression, straight headwall, apron and riprap energy dissipator, controlled low strength material backfill around storm drain pipes, Portland cement concrete sidewalk, curb and gutter, and installation of two watertight storm drain pipes, and a full trash capture device. All work and resulting facilities will fully conform to the current adopted Coachella Valley State Implementation Plan (CVSIP) for PM-10 including Best Management Practices during the construction process. All project work and incidental items to complete the project shall be performed in accordance with the plans, specifications, and other provisions of the contract. All the above improvements are to be constructed in a workmanlike manner, leaving the entire project in a neat and presentable condition. This project is to be completed within 20 working days from the date specified in the Notice to Proceed. Time for commencement and completion of the work is important, and is to be of the essence of the Contract. The successful bidder should plan to order any long lead-time equipment items immediately following Notice of Award. There is no pre-bid conference scheduled for this project. Bidding procedures are prescribed in the Project Specifications. Bids shall be executed upon the forms bound and made a part of said Specifications. Bid security in an amount not less than ten percent (10%) of the total bid dollar amount and conforming to the prescribed bidding procedures is required to be submitted with each bid, as a guaranty to be forfeited should the bidder, if awarded the contract, fail to enter into the same, or fails to furnish in a timely manner the bonds and/or proof of insurance. The City reserves the right to reject any or all bids, and to waive any irregularities in the bids. The successful bidder will be required to furnish a Labor and Materials bond in the amount equal to one hundred percent (100%) of the Contract price, as well as a Faithful Performance Bond, in the amount equal to one hundred percent (100%) of the Contract price. The City reserves the right to reject any or all bids, to waive any irregularity, to accept any bid or portion thereof, and to take all bids under advisement for a period of forty-five (45) days.

Award

Water / Sewer

$82,980.00

Public - City

Site Work

6

8

2

8

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
333
Active Projects
167
Bidding Soon
1,854
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

April 17, 2026

Project location map

Santoro Dr & Cypress Rd, Cathedral City, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.