Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 11, 2026 at 7:00 PM
Updated May 20, 2026
Site work for a civil project in Pine Bluff, Arkansas. Completed plans call for site work for a water / sewer project; and water / sewer project.
The project is for Pine Bluff Wastewater Utility Pump Station 21 Improvements. The work consists of upgrading the existing pump station with two new Flygt pumps and associated appurtenances, and upsizing approximately 550 feet of existing 4-inch force main to 8-inch between the pump station discharge and the existing downstream manhole. Bids shall be on a unit price basis. Each bid must be submitted on the prescribed form and accompanied by a certified check or bid bond payable to the Pine Bluff Wastewater Utility in an amount not less than 5 percent of the amount bid. The bid proposal and contracted work must comply with all applicable federal, state, county, and local laws, ordinances, and regulations. The Owner encourages participation from small, minority, and women business enterprises, and all prime bidders are responsible for downloading the bid documents from the specified online plan room to be included in the Plan Holders List and to submit a bid. Bidders must enter addenda numbers in the Proposal to verify receipt. The Owner reserves the right to reject any bid containing material omissions or irregularities, or if the unit prices are unbalanced, or in any manner fail to conform to the conditions of the Bidding Requirements and Contract Documents. The Owner may waive irregularities, reject bids, choose the most qualified bidder, and postpone award of the contract for up to 90 days from the bid opening date. Question Deadline 02/02/2026: Any person contemplating the submission of a Bid shall have thoroughly examined all of the various parts of these Documents and, should there be any doubt as to the meaning or intent of said Contract Documents, the Bidder should request of the Engineer, in writing (received by the Engineer at least 5 working days prior to bid opening), an interpretation thereof.
Bid Results
Water / Sewer
$296,878.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed