BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 23, 2026 at 7:00 PM

Updated March 23, 2026

Renovation and addition to a clubhouse / community center in The Colony, Texas. Completed plans call for the renovation of a 92,557-square-foot clubhouse / community center; and clubhouse / community center.

The project consists of a renovation of an existing former elementary school building located at 4431 Augusta Street in The Colony, Texas plus the addition of a new gymnasium building for the purposes of creating a new municipal community recreation center. The final scope of work will be determined based on the final Drawings and Specifications prepared by Architect. The work may consist of, but is not necessarily limited to, one or more of the following: site clearing; excavation; fill; select fill and backfill; site utilities; concrete sidewalks; curbs; gutters and paving; rough and finish grading; top soil and seeding; landscaping and irrigation; fencing; concrete piers; concrete slab-ongrade; load bearing masonry exterior and interior walls; structural steel beams; columns, roof purlins and joists; metal roof panels; metal stairways; guardrails and handrails; miscellaneous metal fabrications; rough and finish carpentry; millwork and casework; wood doors; metal doors and frames; aluminum doors and frames; overhead sectional doors; glass and glazing; damp proofing, waterproofing and new roofing; caulking and sealants; thermal insulation; flashing and sheet glazing; carpets; resilient flooring and base; metal studs and support systems; gypsum drywall and acoustical lay-in ceilings; painting; interior and exterior signage; metal louvers and miscellaneous specialties; fire protection; and mechanical; plumbing, HVAC, electrical (including site electrical) and telecommunications systems and other requirements set forth in the Contract Documents. Question Deadline 02/06/2026 at 2:00 PM CT The allowance for the construction period of performance is 460 calendar days as per AIA A133-2019 Exhibit A, section 2.3.1.

Post-Bid

Clubhouse / Community Centers

$24,345,600.00

Public - City

Addition, Renovation

202

38

4

6

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
367
Active Projects
137
Bidding Soon
3,132
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

April 20, 2026

Project location map

4431 Augusta St, The Colony, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.