Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 3, 2026 at 7:00 PM
Updated February 4, 2026
Renovation of a municipal facility in Hazelwood, Missouri. Completed plans call for the renovation of a municipal facility.
The project consists of roof replacement for multiple areas identified as A, A1, B, C, D, E, E1, F, G, PH-1, PH-2, PH-3, and PH-4 at the St. Louis NDC facility. The contractor shall provide all labor, materials, equipment, and supervision necessary to complete the roof replacement work in accordance with the specifications outlined in the Summary of Work. Construction must be completed within 240 calendar days after receipt of the Notice to Proceed. The estimated cost range for this project is between $5,500,000 and $6,800,000. Location: USPS St. Louis NDC, 5800 Phantom Drive, Hazelwood, MO 63042-2487. The estimated cost of the work is between $5,500,000.00 to $6,800,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractor must provide all material, labor, tools, supplies, equipment, transportation, superintendence, temporary construction of every nature, and all other services and facilities necessary to complete the specified work, including all incidental work described in the contract documents. For purposes of this construction project, the terms "Offeror" and "Contractor" are interchangeable and refer to the party whose proposal is accepted by the Postal Service. It is the Owner's sole responsibility to clarify design and construction responsibilities among the Owner's designers, contractors and other agents. B. The scope of work is listed within Articles 1.2 and 1.3 of this Section. C. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard shall apply. D. In case of conflict between the Project Manual and Project Drawings, the more stringent requirement shall apply.
Sub-Bidding
Municipal
$6,800,000.00
Public - Federal
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 23, 2026
March 23, 2026
5800 Phantom Dr, Hazelwood, MO
Related To This Project
Hazelwood, MO
Bid Date: Feb 09 2026
Hazelwood, MO
Bid Date: Feb 23 2026
Hazelwood, MO
--
Hazelwood, MO
--
Hazelwood, MO
Bid Date: Jan 12 2026
Hazelwood, MO
Bid Date: Oct 27 2021
Hazelwood, MO
Bid Date: Dec 04 2025
Hazelwood, MO
Bid Date: Sep 11 2025
Hazelwood, MO
Bid Date: Aug 11 2025
Hazelwood, MO
Bid Date: May 28 2025
Hazelwood, MO
Bid Date: Jun 04 2025
Hazelwood, MO
Bid Date: Apr 28 2025
Hazelwood, MO
Bid Date: Apr 07 2025
Hazelwood, MO
Bid Date: Mar 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
