BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Site work for a water / sewer project in Shorewood, Wisconsin. Completed plans call for site work for a water / sewer project.

The project consists of the installation of a new meter vault station, open cut 8-inch water main, abandonment of existing meter vault station, installation of system appurtenances, and site restoration. Approximate project quantities include 100 linear feet of 8-inch Class 55 ductile iron water main, 2 8-inch valves, 1 meter vault station and appurtenances, 32 tons of asphaltic concrete paving, 150 linear feet of pavement saw cutting, and lump sum items for traffic control and erosion control, together with restoration and other related work. Bids not prepared and filed in accordance with the Instructions to Bidders may be rejected. All bidders who do not have a completed Pre-Qualification Statement with the Village of Shorewood must submit one by close of business on the specified date to be considered for contract award. Bids must be accompanied by a bid bond or certified check payable to the Village of Shorewood in the amount of 5% of the largest possible total bid. The successful bidder must execute the contract and furnish the performance bond within 10 days after award, or the bid bond/check will be forfeited as liquidated damages. Questions deadline: 01/23/2026

Award

Water / Sewer

$297,758.00

Public - City

Site Work

12

19

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
411
Active Projects
220
Bidding Soon
2,018
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2026

August 1, 2026

Project location map

N Oakland Ave, Shorewood, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.