BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2026 at 7:00 PM

Updated February 6, 2026

Site work and paving for a mixed-use development in Shorewood, Wisconsin. Completed plans call for site work for a road / highway; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of February 05, 2026, project was awarded to MP Systems, awarded amount is $1,742,957.13 1. Replacement of approximately 200 luminaires and 117 light poles. 2. Installation of approximately 47,000 feet of HDPE conduit, and 1,100 feet of flexible conduit 3. Installation of 156,000 feet of #6 AWG conductors, 25,000 feet of #12 AWG conductors 4. Installation of approximately 275 Quazite pull boxes (double stacked) 5. Installation of approximately 615 submersible splice blocks 6. Landscape restoration of 1,000 square yards in terraces using sod and topsoil depending on area size, and potential for some concrete sidewalk and asphalt pavement Pre-Qualification: Yes Should any question arise concerning the true meaning of any part of the contract documents, the bidder may submit to the Department of Public Works, a written request for an interpretation thereof. The interpretation of the question so requested will be made in the form of an addendum and emailed to all bidders who may later receive contract documents. Any addenda issued during the time of bidding shall be included with the bid, and in closing a contract they will become a part thereof

Award

Roads / Highways

$1,742,957.00

Public - City

Paving, Site Work

53

22

7

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
0
Bidding Soon
1,383
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2026

March 16, 2026

Project location map

Multiple Locations, Shorewood, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.