Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 26, 2026 at 7:00 PM
Updated January 28, 2026
Demolition and site work for a municipal facility in Decatur, Alabama. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.
All Bids Submitted by Mail Must Be Received in the Community Development Office Prior to the Close of Business on the Date Preceding the Actual Bid Opening Date. Any questions may be directed to the Community Development Department at (256) 341-4960. One bid will be accepted or all bids rejected by CDD within ten (10) calendar days from the above mentioned opening date. CDD reserves the right to reject any or all bids at their discretion. The successful contractor shall furnish a certificate of liability insurance with a minimum of $100,000.00 coverage and a certificate of workman's compensation insurance. Additionally a performance bond will be required on any individual contract which exceeds $25,000.00. Bid shall include all labor, material, permits, fees, and associated costs for the demolition and removal of all structures and their components located on the named property. The City of Decatur will arrange for the retirement of all utilities. Contractor shall notify CDD prior to commencement of demolition. All work shall be satisfactorily complete within 30 days of the contractor's receipt of a Proceed Order. Removal shall include but not be limited to posts, piers, steps, private walks, and private drives. All other trash and debris on the premises shall be removed. Remove any fencing or fence posts on property that would serve only this property. Do not remove property line fences or posts that would affect adjoining properties. If you have any questions you should consult CDD staff before removal. Removal shall be to grade level. Footings and foundations below grade may remain, if non-hazardous. Public sidewalks, public ways, joint driveways, and retaining walls shall be protected from damage and left in place. The City of Decatur makes no representation of salvage value nor guarantees any salvage. Only items of interests may be salvaged. There is to be no salvage for resale or profit. Contractor shall remove all such salvage from the property promptly. All demolition work shall be done with the appropriate industry standard heavy equipment. No hand type demolition shall be allowed. Safe work practices shall be required. Contractor shall not leave any unsafe conditions present on the jobsite at the end of the work day. All materials, other than uncontaminated concrete, soil, brick, rock, and similar materials, or salvage, shall be deposited in the City of Decatur / Morgan County Landfill. Landfill tickets will be required before payment of any sums due. All voids and low spots shall be filled and the property graded for proper drainage. Additional clean soil shall be brought to achieve this goal. The property shall be graded evenly to allow for hand mowing. Remove all sucker growth and vegetation under 6" in diameter, at a minimum. The property shall be hand raked clean of all trash and debris. After raking, the property shall be seeded with a mixture of permanent and annual grasses. Contractor shall obtain permit approval from the Community Development Department, and obtain a permit from the City of Decatur Building Department The contractor shall not commence work until a fully executed copy of this document and Order To Proceed is received from CDD; said executed contract shall be issued within thirty (30) days of acceptance of the contractor's bid. Order To Proceed will be issued at a mutually agreeable time. If contract is not received within the allotted time period, the contractor may, at its option, withdraw its bid. This demolition will require a pre-demolition asbestos survey of the structure by a licensed Alabama asbestos inspector. Regardless of findings, contractor must submit a written asbestos demolition notification at least 10 working days before demolition date, which should include a copy of the asbestos inspection report. If asbestos is found, contractor is responsible for removal of asbestos-containing materials. All asbestos containing materials shall to be removed by contractor per Alabama Department of Environmental Management (ADEM) guidelines.
Post-Bid
Municipal
$20,000.00
Public - City
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 27, 2026
February 26, 2026
410 Railroad St NW, Decatur, AL
Related To This Project
Decatur, AL
--
Decatur, AL
--
Decatur, AL
Bid Date: Jan 14 2026
Decatur, AL
--
Decatur, AL
--
Decatur, AL
--
Decatur, AL
--
Decatur, AL
--
Decatur, AL
--
Decatur, AL
Bid Date: Jan 07 2026
Decatur, AL
Bid Date: Jan 21 2026
Decatur, AL
Bid Date: Nov 13 2025
Decatur, AL
Bid Date: Nov 13 2025
Decatur, AL
Bid Date: Oct 09 2025
Decatur, AL
Bid Date: Oct 29 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
