BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 23, 2026 at 7:00 PM

Updated February 24, 2026

Site work and paving for a civil project in Port Edwards, Wisconsin. Completed plans call for site work for a road / highway; bridge / tunnel; and for paving for a bridge / tunnel.

As of February 16, 2026. Project was awarded to American Asphalt but awarded amount is not available. Verbunker Avenue beginning 211' west of the intersection of Verbunker Avenue and Port Road continuing west to the Town of Seneca limits (Approximately 792 feet) is a LRIP - Town Road Improvement Project. Replace an existing metal 18" culvert with 42' of 18" HDPE dual wall culvert, adding 2" of gravel (140 TONS) Pulverizing full asphalt depth, approximately 4" (1,760 SY), grade, shape so base is crowned to a 2 percent from center line, compact, pave 225 tons of type 4MT 58-28S, 2 inches thick placed in 1-2" lift 10 feet wide per lane, place 30 tons of compacted 3/4 " crushed aggregate for shoulder 2 foot wide by 4 inches deep with a shoulder machine and compacted with a smooth drum or pneumatic roller All work and materials are to be in accordance with Wisconsin Department of Transportation standard specifications for Highway and Structure Construction, 2026 Edition. The Town of Seneca reserves the right to reject any or all bids or to accept any bid deemed most advantageous to the town.

Award

Roads / Highways

$40,258.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2026

June 8, 2026

Project location map

Ver Bunker Ave, Port Edwards, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.