Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 25, 2026 at 7:00 PM
Updated February 13, 2026
Site work for a parking garage in Tulsa, Oklahoma. Completed plans call for site work for a parking garage.
The Tulsa Airports Improvement Trust (TAIT) is hereby soliciting Statements of Qualifications ("Statement(s)") from construction managers at risk for the New Consolidated Rental Car (ConRAC) Facility. To accommodate long-term growth and operational efficiency, TAIT intends to build a modern, consolidated rental car facility with secured ready/return areas, all while maintaining rental car and parking operations during construction and avoiding adding congestion to terminal roadways. The project elements, as generally described, include: o Ready/Return (R/R) Garage Facility o Renovation to the existing Quick Turnaround Area (QTA) Facility which may include the upgrade of QTA systems o Rental/return ingress and egress roadways connecting to existing Airport roadway infrastructure, including any required signage and traffic control elements o Vertical Circulation, both vehicular and pedestrian o Exterior and Interior Operational Signage o Additional "as required" program elements may include QTA Operator spaces, Customer service counter area modifications. The program, which shall be further validated through the design process, may consist of approximately 450,000 sq-ft of space within a 4-level garage. The site the ConRAC will be developed on is constrained on all sides and is currently used as stacking space for the existing QTA. QTA and rental car operations will need to be maintained during construction of the new facility. The final layout of the facility will be determined through the design process. Cost Management. For the entity or division that will provide CMAR services for this proposed contract, provide a list of the last five CMAR contracts with a construction value between $25 million and $100 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Parking Garage
$100,000,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 12, 2026
June 12, 2026
To be determined, Tulsa, OK
Related To This Project
Tulsa, OK
Bid Date: Mar 19 2026
Tulsa, OK
Bid Date: Feb 20 2026
Tulsa, OK
Bid Date: Feb 20 2026
Tulsa, OK
Bid Date: Feb 06 2026
Tulsa, OK
Bid Date: Feb 19 2026
Tulsa, OK
Bid Date: Feb 12 2026
Tulsa, OK
Bid Date: Feb 19 2026
Tulsa, OK
Bid Date: Feb 06 2026
Tulsa, OK
Bid Date: Feb 13 2026
Tulsa, OK
Bid Date: Feb 20 2026
Tulsa, OK
Bid Date: Feb 04 2026
Tulsa, OK
Bid Date: Jan 22 2026
Tulsa, OK
Bid Date: Jan 28 2026
Tulsa, OK
Bid Date: Jan 21 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
