Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 5, 2026 at 7:00 PM
Updated March 6, 2026
Demolition and site work for a road / highway in Moline, Illinois. Completed plans call for the demolition of a road / highway; and for site work for a road / highway.
As of March 05, 2026, project was awarded to Coopman H Truck & Excavating Inc., but awarded amount is not available. 7th Street Properties Demolition Project The City of Moline (hereinafter: "City") requests bids for the 7th Street Properties Demolition Project, per the identified minimum specifications . LOCATIONS: - 1410, 1504, 1508 7th St., Moline IL. Question Cuttoff Date & Time 2/5/2026 01:00:00 AM (ET) For all questions regarding this bid, please contact: James Whiting, Facilities Manager, 309-524-2400 or jcwhiting@moline.il.us. COmpletion- May 22nd, 2026. The inspection of the building revealed asbestos containing materials consisting of approximately: 1410 7th St. Moline, IL :- 7,200 ft2 of 9x9 floor tile & mastic throughout (including mastic under ceramic tile in the lower level), 7,200 ft2 of ceiling tile mastic throughout, drywall joint compound throughout, <25 ft2 of exterior caulk and <25 ft2 of roof flashing cement. Assume there is transite duct under the slab in the lower level. The building is a one story structure with a lower level, concrete foundation, brick exterior and flat roof. Heat was provided by a forced air furnace system. 1504 7th St. Moline, IL :- 7,200 ft2 of 9x9 floor tile & mastic throughout (including mastic under 12x12 floor tile & carpet), 7,200 ft2 of mastic on lxl ceiling tile, drywall joint compound throughout and 25 If of vent pipe in the lower level mechanical roof through the roof. The building is a one story structure with a lower level, concrete foundation, brick exterior and flat roof. Heat was provided by a forced air furnace system. 1508 7th St. Moline, IL :- 2,500 ft2 of 9x9 floor tile & mastic on 1st floor, 2,500 ft2 of ceiling tile mastic on 1st floor, drywall joint compound on 1st floor, black furnace pipe wrap in the mechanical room, <25 ft2 of exterior caulk and 500 ft2 of tar paper on the ends under the wood shake siding. The building is a one story structure with an unfinished lower level, concrete foundation, brick exterior and pitched shingled roof. Heat was provided by a forced air furnace system.
Award
Roads / Highways
$200,000.00
Public - City
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2026
March 13, 2026
Multiple Locations, Moline, IL
Related To This Project
Moline, IL
Bid Date: Feb 03 2026
Moline, IL
Bid Date: Feb 03 2026
Moline, IL
Bid Date: Feb 03 2026
Moline, IL
Bid Date: Feb 03 2026
Moline, IL
Bid Date: Feb 05 2026
Moline, IL
Bid Date: Feb 05 2026
Moline, IL
Bid Date: Feb 27 2026
Moline, IL
Bid Date: Feb 17 2026
Moline, IL
Bid Date: Feb 11 2026
Moline, IL
Bid Date: Feb 05 2026
Moline, IL
Bid Date: Jan 27 2026
Moline, IL
Bid Date: Jan 27 2026
Moline, IL
Bid Date: Feb 03 2026
Moline, IL
Bid Date: Jan 20 2026
Moline, IL
Bid Date: Jan 20 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
