BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2026 at 7:00 PM

Updated February 11, 2026

Site work for a water / sewer project in Glencoe, Illinois. Completed plans call for site work for a water / sewer project.

Scope of Work The Base Bid shall include water main installation and appurtenances on Grove Street, Milton Avenue, and Bluff Street from Dundee Road to the intersection with Milton Avenue. Bid Alternative No. 1 shall include water main installation and appurtenances on Bluff Street south of Milton Avenue to Lincoln Avenue. Bid Alternative No. 2 shall include water service transfers on Lincoln Avenue. CONTRACTOR shall provide all items, articles, materials, operations or methods mentioned or scheduled on the Drawings or herein specified: including all labor, supervision, equipment, incidentals, taxes, and permits necessary to complete the Work as described within the Contract Documents. CONTRACTOR shall install all items provided by OWNER as mentioned or scheduled on the Drawings or herein specified. 1.03 CONTRACT DOCUMENTS-INTENT AND USE A. Intent of Documents: 1. Singular notations and Specifications shall be considered plural where application is reasonably inferred. 2. Mention or indication of extent of work under any division or Specification section is done only for convenience of CONTRACTOR and shall not be construed as describing all work required under that division or section. 3. Some individual sections may contain a list of related sections. The list of related sections in individual sections is provided for the convenience of CONTRACTOR and is not necessarily all-inclusive. CONTRACTOR may not rely upon this listing for determination of scope of work. Other sections of the Specifications not referenced in individual sections shall apply as required for proper performance of the Work. 4. Command type sentences may be used in the Contract Documents. These sentences refer to and are directed to CONTRACTOR. 5. Symbols for various elements and systems are shown on the Drawings. Should there be any doubt regarding the meaning or intent of the symbols used, a written interpretation shall be obtained from ENGINEER. B. Use of Documents: 1. CONTRACTOR shall examine all Specifications and Drawings for the Work, including those that may pertain to Work CONTRACTOR does not normally perform with its own forces. 2. CONTRACTOR shall use all of the Project Drawings and Specifications: a. For a complete understanding of the Project. b. To determine the type of construction and systems required. c. For coordination with other contractors. d. To determine what other work may be involved in various parts or phases. e. To anticipate and notify others when work by others will be required. f. And all other relevant matters related to the project. 3. CONTRACTOR is also bound by all requirements of the Contract Documents which are applicable to, pertain to, or affect its Work as may be shown or inferred by the entire set of Project Drawings and Specifications. location MILTON AVE.GLENCOE, IL 60022 WATER MAIN REPLACEMENT ON MILTON AVE. BLUFF ST. TO GROVE ST BLUFF ST. GLENCOE, IL 60022 WATER MAIN REPLACEMENT ON BLUFF ST. DUNDEE RD. TO LINCOLN AVE GROVE ST. GLENCOE, IL 60022 WATER MAIN REPLACEMENT ON GROVE ST. DUNDEE RD. TO MILTON AVE. LINCOLN AVENUE GLENCOE, IL 60022 WATER SERVICE TRANSFERS ON LINCOLN AVE. FROM PRAIRIE RD. TO BLUFF ST BLUFF STREET GLENCOE, IL 60022 WATER MAIN REPLACEMENT ON BLUFF ST. FROM MILTON AVE. TO LINCOLN AVE

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Site Work

42

17

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
724
Active Projects
425
Bidding Soon
3,980
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2026

April 13, 2026

Project location map

Multiple Locations, Glencoe, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.