BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Site work and paving for a road / highway in Saint Louis, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

South Broadway Multimodal Improvements; Dover to River City Casino Blvd Allows zero unit prices and labor No Allows negative unit prices and labor NoPlans, Specifications, and the Agreement may be examined online at Online and may be downloaded for free. If any prospective bidder is in doubt as to the intended meaning of any of the specifications, plans, or other proposed Contract Documents, that person may submit, in writing using the Q/A feature in Online , a request for an interpretation thereof. All requests for interpretation must be submitted no later than the end of the business day, 6 calendar days before the bid is due. Any such interpretation will be in the form of an addendum to the specifications to all bidders. Each bidder shall specify in their proposal in figures, a unit price or lump sum for each of those items where so-called for in the proposal. Each bid must be accompanied by a Cashier's or Treasurer's Check of a Bank or Trust Company in the City of Saint Louis, payable to the Order of the City Treasurer, or a Surety Bond approved by the Comptroller, for the amount of Deposit required, as heretofore stated. If submitting a paper Bid Bond or Check, an original copy must be submitted to the Board of Public Service (Helen Bryant, Room 301 City Hall, 1200 Market Street, St. Louis, MO 63103) prior to bid opening, and a scanned copy must also be uploaded to Online with the bid. All work under this contract will be paid for in cash, based on monthly estimates of the work completed, less a retained amount of five percent (5%). Final payment, including all retained percentages, will be made within ten (10) days after completion of all work and final acceptance by the City. All labor to be performed under this contract shall be subject to the provisions of Sections 290.210 to 290.340, inclusive of the Revised Statutes of Missouri. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in the City of St. Louis as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher, including the general prevailing rate for legal holiday and overtime Work.

GC Bidding

Roads / Highways

$1,250,000.00

Public - City

Paving, Site Work

45

10

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
135
Bidding Soon
1,441
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2026

April 27, 2026

Project location map

Multiple Locations, Saint Louis, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.