BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2026 at 7:00 PM

Updated February 6, 2026

Site work and paving for a mixed-use development in Brighton, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000409997 Whitmore Lake Road Reconstruction Between Silver Lake Road and North to the 2022 Paving Limits in sections 8, 17 & 20 of Green Oak Township, Livingston County, Michigan. Includes: 1.3 miles of pavement reconstruction including Earth Excavation, Subbase CIP, Aggregate Base, HMA paving with pavement markings, curb & gutter placement, and drainage improvements, altogether with the necessary related work. Project Quantities: HMA surface 11,855 Tons, HMA surface milling 17,556 Syd, Aggregate Base 13,995 Tons, Subbase CIP 10,227 Cyd, Earth Excavation 22,120 Cyd, Slope Restoration 15,619 Syd, Curb & Gutter placement 336 Ft; altogether with necessary related items. Question Acceptance Deadline 02/13/2026 10:00 AM EST Questions are submitted online No Prequalification with MDOT as a Prime Contractor is required. A certified or cashier's check on an open, solvent bank shall be submitted with each individual bid in the amount of $10,000.00 payable to the Livingston County Road Commission for Item No.1. *The Board reserves the right to accept or reject any or all bids, to waive any informality in bids and to accept the bid which is in the best interest of the County of Livingston.

GC Bidding

Roads / Highways

$700,000.00

Public - County

Paving, Site Work

132

3

3

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
323
Bidding Soon
2,574
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

March 19, 2026

Project location map

Whitmore Lake Rd, Brighton, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.