Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published March 3, 2026 at 7:00 PM
Updated March 4, 2026
Site work for a civil project in Marlborough, Massachusetts. Completed plans call for site work for a water / sewer project.
Project Birch Road Sewer Pump Station Improvements The project consists of but not limited too; handling of existing wastewater flows and bypass pumping, manhole-to-manhole replacement of existing sewer main and services, installation of sewage grinder manhole, replacement of existing wet well, installation of valve vault structure, removal of existing single-phase duplex submersible pumps and associated hardware. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The participation goals for this project shall be for minorities and for women is 5%. Work included: 1. The Work of this section includes all labor, tools, material, fittings, accessories and equipment necessary to provide plumbing system(s), complete and operable and in accordance with this section of these specifications, the drawings and the standards of the applicable codes listed therein. 2. The Plumbing Contractor shall be responsible for the following: a. LP Gas supply system from the supply tank connecting to the Generator. b. LP Gas Containers - Furnish, Install and Pipe, including an initial fill of LP gas. c. Painting of gas piping and supports. 3. The Work shall include the furnishing, set-up and maintenance of all derricks, hoisting machinery, scaffolds, staging, planking, ladders, etc. as required for the Work. 4. Secure all permits, inspection, and approvals and pay all costs and fees. 5. Unless the Specifications state "No Substitutions", substitutions will be considered for any specified item. 6. Coordinate safety program with that of the General Contractor. Cooperate with other trades to establish lines, levels, openings, chases, clearances, and locations to avoid interference, and to protect the Work. The project consists of handling of existing wastewater flows and bypass pumping, manhole-to-manhole replacement of existing sewer main and services, installation of sewage grinder manhole, replacement of existing wet well, installation of valve vault structure, removal of existing single-phase duplex submersible pumps and associated hardware, furnishing and installation of new sewage grinder unit, furnishing and installation of new three-phase duplex submersible cutter pumps and associated hardware, installation of new submersible level transducer and digital controller with emergency back-up high level alarm float, installation of Mission alarm notification system, removal and replacement of existing control panel with a new control panel, installation of VFD to convert single-phase input power to three-phase, installation of new underground electrical conduits, removal and proper disposal of existing fence and installation of new fence, removal and proper disposal of existing liquid propane generator and fuel storage tank, installation of a new liquid propane generator and fuel storage tank, installation of new water service and yard hydrant, paving of pump station site and driveway, environmental controls, loaming and seeding, landscaping, dewatering as necessary, and all other items required to provide a completed operational sewer pump station as shown and specified in the Birch Road Sewer Pump Station Improvements contract documents, including all labor, material and equipment necessary to complete the Work. The estimated project cost is approximately $1,750,000.00. Question Deadline 02/09/2026 Questions concerning the bid specifications must be submitting in writing via email to Attn: Mark Dascoli at mdascoli@marlborough-ma.gov no later than 3 business days prior to the scheduled bid opening.
Award
Water / Sewer
$1,355,960.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 12, 2026
April 13, 2026
Birch Rd, Marlborough, MA
Related To This Project
Marlborough, MA
--
Marlborough, MA
Bid Date: Apr 30 2026
Marlborough, MA
--
Marlborough, MA
Bid Date: Apr 29 2026
Marlborough, MA
Bid Date: Apr 23 2026
Marlborough, MA
Bid Date: Jun 15 2026
Marlborough, MA
--
Marlborough, MA
Bid Date: Jun 25 2026
Marlborough, MA
Bid Date: Jan 22 2026
Marlborough, MA
Bid Date: Dec 11 2025
Marlborough, MA
Bid Date: Dec 17 2025
Marlborough, MA
--
Marlborough, MA
Bid Date: Oct 31 2025
Marlborough, MA
Bid Date: Oct 24 2025
Marlborough, MA
Bid Date: Oct 09 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed