BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2026 at 8:00 PM

Updated March 12, 2026

Renovation of an educational facility in Richfield, Utah. Completed plans call for the renovation of a educational facility.

Stage II Invitation to Bid** **Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project.** The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project: **Project Description: Provide a dedicated VAV box and associated ductwork, controls, etc. for the nail classroom. Remove the existing make-up air unit serving the nail salon with a smaller unit and update controls. Remove existing hoods and associated exhaust fans and make-up air unit from the old art studio / current biology room. Provide new VAV box and associated ductwork, controls, etc. for the biology classrooms. Repair ceilings, lighting, and fire sprinklers as needed to accommodate. HVAC upgrades & modifications to Snow College's Washburn Building in Richfield, UT. Questions Deadline Tuesday, February 17, 2026 3:00 PM U3P All project related requests for information, clarifications, and questions must be submitted to DFCM via the U3P website no later than the time and date specified on the Solicitation Schedule o Provide a dedicated VAV box and associated ductwork, controls, etc. for the nail classroom o Remove the existing make-up air unit serving the nail salon with a smaller unit and update controls o Remove existing hoods and associated exhaust fans and make-up air unit from the old art studio / current biology room o Provide new VAV box and associated ductwork, controls, etc. for the biology classrooms o Repair ceilings, lighting, and fire sprinklers as needed to accommodate The Work consists of the following: 1. The Work includes: a. Remove existing abandoned exhaust air hoods and systems and associated make-up air equipment. b. Provide new VAV boxes, new exhaust fans, and associated piping, ductwork, controls etc. c. Remove and replace ceiling and lights in classrooms where indicated in drawings

Award

Educational

$208,226.00

Public - State/Provincial

Renovation

15

17

2

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

March 27, 2026

Project location map

800 W 200 S, Richfield, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.