Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 22, 2026 at 7:00 PM
Updated January 23, 2026
Site work and paving for a mixed-use development in Fountain City, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and bridge / tunnel.
Limit : CTH G to CTH A The pavement needs treatment to extend its service life. Perpetuation project to resurface approximately 9.45 miles of STH 95 in Buffalo County. The anticipated design includes a 5 mill and a 5 HMA overlay. Additional work includes gravel shouldering, replace all beam guard, spot curb & gutter replacement, culvert cleaning, culvert endwall replacement, culvert replacement, scour repair, riprap, cattle pass removal, roadside clearing, edgeline rumble strips, and pavement marking. TPP/TLE Acquisition exhibits required for an estimated 5 TLE and 3 PLE parcels. Anticipated to be constructed under traffic utilizing single-lane flagging operations. Anticipated Construction Cost: $7,000,000-$7,999,999 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Fountain City - Arcadia *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$7,999,999.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
WI-95, Fountain City, WI
Related To This Project
Fountain City, WI
Bid Date: Feb 04 2026
Fountain City, WI
Bid Date: Feb 13 2026
Fountain City, WI
Bid Date: Oct 14 2025
Fountain City, WI
Bid Date: Jul 01 2025
Fountain City, WI
Bid Date: May 23 2025
Fountain City, WI
Bid Date: May 12 2025
Fountain City, WI
Bid Date: May 21 2025
Fountain City, WI
Bid Date: Apr 02 2025
Fountain City, WI
Bid Date: Mar 27 2025
Fountain City, WI
Bid Date: Mar 25 2025
Fountain City, WI
--
Fountain City, WI
Bid Date: Dec 30 2024
Fountain City, WI
Bid Date: Sep 13 2024
Fountain City, WI
Bid Date: Sep 10 2024
Fountain City, WI
Bid Date: Jul 12 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
