BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 18, 2026 at 8:00 PM

Updated March 19, 2026

Site work for a water / sewer project in Burnham, Illinois. Completed plans call for site work for a water / sewer project.

Sealed proposals are being requested for the Lead Water Service Line Replacements project, IEPA FY 2026 IEPA Number L177543. Proposals must be submitted in sealed envelopes with the name and address of the bidder and the project name labeled on the outside. All proposals must be completed on forms provided by the Engineer. A bid bond of not less than five percent (5%) of the bid amount must be included with each proposal as a guarantee that if the proposal is accepted, a contract will be entered into and the contract’s performance will be properly secured. A performance bond equal to one hundred percent (100%) of the bid amount, with approved sureties, is required for the faithful performance of the contract. The prevailing wage rate, as established by the U.S. Department of Labor and the Davis Bacon Act, must be paid, and all applicable Federal, State, and local regulations must be followed. Proposals must include an offer to furnish a bond upon bid acceptance. Bidder qualifications and experience will factor into determining the lowest responsible bidder, and prequalification must be submitted to the Engineer. The contractor or subcontractor responsible for water service line replacement must be a licensed plumbing contractor in Illinois and provide a copy of the Plumbing License before contract award. Contractor registration through Sam.gov with a unique Entity ID Number is also required. Compliance with federal regulations, including the Build America, Buy America Act, the Davis-Bacon Act, and affirmative efforts specified for disadvantaged business enterprises, is mandatory. The procurement is subject to the recipient’s policy on disadvantaged business enterprises, and bidders must comply with all requirements of President’s Executive Order No. 11246, as explained in 41 CFR 60-4.

Award

Water / Sewer

$3,114,185.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
554
Active Projects
255
Bidding Soon
4,500
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

April 11, 2026

Project location map

To be determined, Burnham, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.