BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2026 at 7:00 PM

Updated February 13, 2026

Site work and paving for a sidewalk / parking lot in Severance, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000409721 The Work of this Contract consists of removal of pavers, replacement of concrete curb and gutter, concrete sidewalk, and concrete ramps at the Transfort Downtown Transit Center located at 250 N Mason St in Fort Collins, CO 80524. This Work is being done to bring several pedestrian areas into ADA (Americans with Disabilities Act) compliance. It is the intent of the Owner to minimize the impact on normal functions of the Transit Center, its employees, vendors, visitors, contractors, or related outside businesses during the Work of this project. Communication with the Owner will be critical in order to maintain operations and achieve project goals to minimize impacts to daily operations. There will be two phases to this project - Phase 1 includes all Work described on Sheet 4, Phase 2 includes all Work described on Sheets 2 & 3. The Work will need to be Substantial completed within thirty-five calendar days from the Notice to Proceed which the City anticipates issuing for May 4, 2026, and then Final completion would be fourteen (14) days after Substantial completion. The awarded Contractor will be responsible for the following: Procuring all necessary permits. Submitting and managing an approved Traffic Control Plan. Stockpiling all pavers, on pallets, and transferring them to 701 Wood St. Coordinating all inspections, via City of Fort Collins and third-party inspectors. Providing a portable restroom for their workers. Note to bidders - Pedestrian crosswalks in drive lanes or bus entrances will be constructed with red concrete, Davis Color Brick Red, with a standard broom finish. Pedestrian crosswalks are located on Sheets 2, 3, and 4. PHASING PLAN Phase 1 includes all Work described on Sheet 4. These phases have been suggested to minimize Contractor equipment and traffic moving back and forth across the DTC exit. The Downtown Transit Center will remain open and operate as normal during Phase 1. Phase 2 will close the Maxline bus stop and main bus entrance to DTC. During the Work, buses may travel through DTC at irregular time intervals. The Contractor must coordinate Work, materials and equipment to allow safe entrance and exit of pedestrians and buses to and from the east and center island bus stops as well as the east and west bus lanes. Contractor equipment and vehicles can be parked in the lane that MAX uses during this phase. This is a Federally funded project requiring compliance with the included Federal Transit Administration Federally Required and Other Model Contract Clauses. Davis Bacon Wages and all Federally wage reporting is required as part of the awarded contract. A copy of the wage rates can be found in Section 00800 Supplementary Conditions. There is not a DBE Goal assigned to this contract. Bidders must complete, sign and submit with the bid all documents in Sections 00300 and 00400 including but not limited to CDOT Bidding forms 606, Buy America Certificate, and Lobbying Certificate with the Bid. Bids will not be accepted if these documents are not included. The City encourages all qualified businesses to participate in this Invitations to Bid (ITB) and no person or business shall be subjected to discrimination on the grounds of race, color, or national origin. Question Deadline 02/11/2026 at 3:00 PM MT Questions are submitted online No, All questions should be submitted, in writing via email, to Adam Hill, Senior Buyer at adhill@fcgov.com Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on online. Bid Bond in the amount of not less than 5% of the total Bid must accompany each Bid in the form specified in the Instructions to Bidders. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the Contract. No Bid may be withdrawn within a period of ninety (90) days after the date fixed for opening Bids. The City reserves the right to reject any and all Bids, and to waive any informalities and irregularities therein.

GC Bidding

Sidewalks / Parking Lot

$600,000.00

Public - City

Paving, Site Work

7

7

5

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
158
Bidding Soon
1,198
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2026

May 4, 2026

Project location map

250 N Mason St, Severance, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.