BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2026 at 7:00 PM

Updated March 4, 2026

Site work and renovation of a water / sewer project in Rockwell, North Carolina. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

Bids are requested for the Nazareth Children's Home Lift Station Rehabilitation. Bids must be submitted on the designated form and may be rejected if not. Provide and install: _ 4-inch flanged bypass connection using linestop and/or team valve (possibly inserta-valve) o MJ gate valves to be cut-in if practical/feasible o Cement lined, epoxy coated ductile piping to be utilized underground o Underground connections using restrained MJ connections o Concrete kickers at force main bends including restrained MJ connections and stainless support rodding _ Bypass pumping setup for duration of the project (including vac truck as needed) o Primary enclosed pump for noise mitigation o Open unit backup pump o Alarm system for high level monitoring o Pump system to be checked daily by contractor while in use, including weekends and holidays _ 4-inch isolation valve to be installed between station and bypass connection _ Re-route existing force main inside wet well and between wet well and bypass connection o Utilize 304 stainless piping inside wet well and through wet well wall _ Remove existing pumps, motors, and structure o Haul away and dispose of removed items _ Remove existing trash basket, rails, and wet well steps _ Remove or install permanent plug to old force main piping through wall _ Install new above ground USEMCO valve box (weather-proof, heated, and fan cooled) o Provide electrical junction box for pumps and floats inside USEMCO valve box o Eliminates confined space requirements to service valves and/or valve piping _ Duplex submersible pumps (flow and head to be tested and compared to SRU existing data) o Power conditions to be tested at station o Verify electrical and control system at pump station o Contractor responsible for electrical modifications to support new pumping system _ Does not include changes to service, service changes to be responsibility of SRU o Stainless guide rails, chains, float bracket, fasteners o Utilize stainless flanged connections to pump bases o No flange adaptors to be used at pump bases o USEMCO stub pipes (3) to be connected using stainless STRAUB bolted couplings _ Wet well epoxy coating o Coating based on concrete in relatively good condition o Concrete condition to be assessed by contractor before station is taken offline o Prep of walls, ceiling, and wet well bottom o Skim coat of Tnemec 217 mortar o Epoxytec coating (100-125 mils) _ Demo and Installation of new electrical components o Electrical evaluation of existing equipment by licensed NC Electrical Engineer _ Electrical panels to be reused with necessary modifications made by contractor _ Any modifications or changes to electrical service to be by SRU o New wiring and conduits for additions/changes made during rehab o New stainless junction box(es) for power/controls at wet well/valve box o Installation of pump modules/relays _ Modifications to existing concrete/additions to existing concrete for new station components _ Seal existing concrete top openings as needed _ Utilize existing hatch opening or add new hatch opening. _ Startup procedure performed for new pumps _ Bypass system will be dismantled and removed _ Service crew trained in confined space entry and rescue during project _ Confined Space and Rescue equipment provided on site for project duration _ Head and flow of pumping system based on current existing system _ New gravel added to disturbed area and within lift station fencing _ Includes cleanup of jobsite to meet prior condition of lift station _ All materials used to be of brand/quality accepted by SRU o Piping and Fittings in wet well to be 304 stainless steel with welded connections The offer must be valid for 60 days from the bid opening unless otherwise stated. The bid price must be FOB Destination and include delivery to the specified location. additional DELIVERED BY US POSTAL SERVICE Salisbury-Rowan Utilities Nazareth LS Rehab 013-2026 Attn: Jason Wilson 1 Water Street Salisbury, NC 28144 DELIVERED BY ANY OTHER MEANS Salisbury-Rowan Utilities Nazareth LS Rehab 013-2026 Attn: Jason Wilson 1 Water Street Salisbury, NC 28144 Questions regarding the specifications on this bid should be referred to Trenton Dorroh at trenton.dorroh@salisburync.gov by Thursday, February 12, 2026 at 2:00 PM.

Post-Bid

Water / Sewer

$500,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

April 20, 2026

Project location map

855 Crescent Rd, Rockwell, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.