Published February 4, 2026 at 7:00 PM
Updated February 5, 2026
Renovation of a municipal facility in Tucson, Arizona. Completed plans call for the renovation of a municipal facility.
Reference Number 0000409531 Bid Intent Not Available Question Deadline 02/12/2026 at 5:00 PM MT Questions are submitted online Yes, INQUIRIES: County will not accept verbal requests for clarifications or interpretations. Offerors must submit any questions or deviation requests through the online solicitation portal. Any addenda to this Invitation for Bid will be posted online. This project intends to replace the existing chiller with a new chiller at Pima County Juvenile Courts Complex located at 2225 E. Ajo Way, Tucson, AZ 85713. The project shall be complete and in place within 40 calendar days from Notice to Proceed. Liquidated damages for late delivery will be assessed per Article 7 of the General Conditions. Due to limited subcontracting opportunities, no Small Business Enterprise (SBE) goal is established for this Contract. Certified SBE firms are encouraged to participate. BID BOND: Bids must be accompanied by an original bid guarantee of 10% of the TOTAL BID amount. Pima County accepts the forms of bid guarantee provided in A.R.S. 34-201(A) (3). Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % Estimated cost for the project is between $700,000.00 and $800,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The County will provide a Conditional Notice to Proceed which will authorize the Contractor to order the required equipment. Testing and delivery shall be included as part of the Conditional Notice to Proceed. Upon receipt of notification from the Contractor of delivery of equipment onsite, the County will issue a Construction Notice to Proceed which will initiate the construction completion time defined in the Sample Contract. Contractor must remove the existing chiller from Juvenile Central Plant. 3.2. Contractor must extend existing chiller pad if needed along with any additional modifications to the pad. 3.3. Contractor will provide full factory warranty service 24/7 flange to flange at no additional cost to Pima County for two (2) years beginning at initial startup. 3.4. The chiller shall be factory performance tested. Performance of chiller will be witnessed and verified by representatives of Pima County by utilizing telepresence or in person. 3.5. A factory representative shall be provided for inspection of installation, initial start-up and training of Facilities Management Personnel at the Pima County site. 3.6. Contractor will dispose of the old unit in accordance with Industry standards. 3.7. Contractor will make any necessary piping modifications. 3.8. Contractor will make any necessary electrical modifications and upgrades. 3.9. Contractor will provide and install harmonic filter for compressor variable speed drive. 3.10. Contractor will provide and install water flow switch. 3.11. Contractor will provide and install a marine water box on condenser only. 3.12. Contractor will provide and install single point power connection with disconnect switch. 3.13. Contractor will provide and install factory insulation package.
Sub-Bidding
Municipal
$800,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2026
March 23, 2026
2225 E Ajo Way, Tucson, AZ
Related To This Project
Tucson, AZ
Bid Date: Feb 17 2026
Tucson, AZ
Bid Date: Feb 12 2026
Tucson, AZ
--
Tucson, AZ
Bid Date: Feb 12 2026
Tucson, AZ
Bid Date: Mar 05 2026
Tucson, AZ
Bid Date: Feb 02 2026
Tucson, AZ
Bid Date: Apr 03 2026
Tucson, AZ
Bid Date: Feb 13 2026
Tucson, AZ
Bid Date: Feb 09 2026
Tucson, AZ
Bid Date: Feb 05 2026
Tucson, AZ
Bid Date: Feb 20 2026
Tucson, AZ
Bid Date: Feb 03 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.