Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 23, 2026 at 7:00 PM
Updated February 24, 2026
Site work for a playground / park / athletic field in Jasper, Georgia. Completed plans call for site work for a playground / park / athletic field.
Description :- Pickens County Schools has issued this Request for Proposal; hereafter referred to as "RFP", except where noted for clarity, for the purpose and intent of obtaining bid responses from licensed, qualified firms to complete playground renovations a Hill City Elementary School located at 600 Hill Circle, Jasper, GA 30143. February 10, 2026 All Questions Due @ 3:00 PM All questions concerning this RFP should be directed to Jacob Poole, Director of Facilities, Pickens County School District. All inquiries must be in writing and emailed to jacobpoole@pickenscountyschools.org. Site Area A: Approximately 7,500 sq. ft. ( Vendor to verify) Remove excess dirt, mulch, and etc. to establish a proper base and depth for PIP EPDM surfacing. Onsite disposal of dirt and mulch, rock only will be permitted. Base aggregate should meet compaction needs. Drainage should be considered and a plan provided to help insure the PIP meets life expectancy. PIP surface should meet standards for running slope, cross slope, etc. PIP color desired is a mixture of gray/green/blue combination Meet ASTM F1951 and ASTM F1292 CFH requirements, Add 2 play structures to left side that serve an age range of 5-12-year-old children Have a combined min- max play capacity of 75-100 Min Elevated activities 30-35 Ground Level accessible types 5-10 range Ground Level activities 7-10 range Add new 4 Bay Swing set to right side, for age group 5-12, min 8 swings New structures color schemes should stay with the gray/blue/green theme. ADA accessibility and Meet ASTM 1487-17 and CPSC-325 standards Remove excess dirt, mulch, and etc. to establish a proper base and depth for PIP EPDM surfacing. Base aggregate should meet compaction needs. Drainage should be considered and a plan provided to help insure the PIP meets life expectancy. PIP surface should meet standards for running slope, cross slope, etc. PIP color desired is a mixture of gray/green/blue combination Meet ASTM F1951 and ASTM F1292 CFH requirements. Add 1 Play Structure for age group 2-5 with play capacity min-max 35-50 Add 1 Play structure for age group 2-5 with a capacity min -max of 25-30 Add 2 bay swing frame for age group 2-12 min 4 swings Color theme preference of gray/green/blue Add 1 Play Structure age group 2-5 capacity min-max 10-20 Add 2 - 2 person-Spring Rockers (See-saw type activities) ADA accessibility and Meet ASTM 1487-17 and CPSC-325 standards Enhancements Add 1 10 x 10 x 8 Hip Shade Cover to location (1) Add 1 tenor tree musical instrument activity to location (2)
Post-Bid
Playgrounds / Parks / Athletic Fields
$300,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
