Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2026 at 7:00 PM
Updated February 10, 2026
Site work for a civil project in Burney, California. Completed plans call for site work for a water / sewer project; and water / sewer project.
Separate sealed bids are invited for the construction of the Water System Improvement Project, which consists of improvements to an existing booster pump station (including installing a new emergency backup generator and ATS, and replacing pumps, piping, MCC, MSB, and control panels); improvements to three existing water storage tanks (coating tank interiors and exteriors, installing antennas and control panels); improvements to three existing wells (replacing pumps, motors, and piping; new electrical; building upgrades and repairs); and constructing a new central electrical and control building for the three wells (new MSB, MCC, control panels, and chlorine room). Bids will be received for a single prime contract on a lump-sum/unit-price basis, and will be evaluated on the Base Bid amount. Prospective bidders must be licensed Contractors in the State of California, skilled and regularly engaged in the type of work called for, with a Class A California Contractor's license. The project requires compliance with both California and US Department of Labor (Davis-Bacon) prevailing wage laws, and mandates the use of American-made iron and steel under the "American Iron and Steel" requirements if the project is funded by the State Revolving Fund. Good Faith Efforts for Disadvantaged Business Enterprises (DBE) participation are required, following listed outreach and recruitment activities, including the use of SBA and MBDA services and solicitation posting requirements. The Owner reserves the right to accept or reject any and all bids. Engineer's Construction Cost Estimate is $5,700,000 to $7,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions regarding the Bidding Documents shall be directed to Erin Kiser at ekiser@paceengineering.us or (530) 244-0202 or to Grant Maxwell at gmaxwell@paceengineering.us or (530) 244-0202.
Sub-Bidding
Water / Sewer
$7,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 26, 2026
April 27, 2026
Multiple Locations, Burney, CA
Related To This Project
Burney, CA
Bid Date: Feb 19 2026
Burney, CA
Bid Date: Dec 04 2025
Burney, CA
Bid Date: Apr 01 2025
Burney, CA
Bid Date: Nov 18 2024
Burney, CA
--
Burney, CA
Bid Date: Jan 12 2024
Burney, CA
Bid Date: Nov 02 2023
Burney, CA
Bid Date: Oct 26 2023
Burney, CA
Bid Date: Jan 25 2022
Burney, CA
Bid Date: May 22 2024
Burney, CA
Bid Date: Mar 04 2021
Burney, CA
Bid Date: Dec 13 2022
Santa Rosa, CA
Bid Date: Feb 19 2026
Palmdale, CA
Bid Date: Feb 24 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
