Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 4, 2026 at 7:00 PM
Updated February 5, 2026
This is a service / maintenance or supply contract in Chicago, Illinois. Contact the soliciting agency for additional information.
The Metropolitan Pier and Exposition Authority ("Authority") is seeking bids from qualified companies to provide the goods and/or services described herein to the Authority. The MPEA does not require a bid deposit, however if a bidder fails to honor the terms and conditions that attach to submitting a bid, including but not limited to holding its bid for a period of 90 days from bid opening, the MPEA reserves the right to declare Bidder non-responsible and Bidder will not be eligible to bid on or be awarded contracts with the MPEA for a period of up to one year. The Contract begins on the Effective Date and shall remain in effect for a base term of term of two (2) years. The Authority shall have the option to renew the Contract under the same terms and conditions as the original Contract. However, the Contract may not renew automatically, nor may the Contract renew solely at the Contractor's option. The Authority reserves the right to renew for a total of two (2) years in one of the following manners: a) One renewal covering the entire renewal allowance, or b) Individual one-year renewals up to and including the entire renewal allowance. The Authority intends to award the Contract to the lowest, responsible and responsive Bidder by Group. Notwithstanding the foregoing, the Authority hereby reserves the right to reject or to accept any or all Bids that, in its judgment, shall be in the best interest of the public. Bids that contain omissions, erasures, alterations, or additions not called for, conditional or alternate Bids not called for, or that are irregular in any way, may be rejected as informal and insufficient. However, the Authority reserves the right to waive all informalities when it may deem such waiver to be in the best interest of the public. The Authority shall undertake a thorough review of each submitted Bid. This review process may take approximately ninety (90) days, at which time the Board of the Authority may take the necessary steps to award the Contract or may, at its option, after informing the three (3) lowest Bidders in writing of its intention, extend the time to award the Contract an additional thirty (30) days. Category 1: Bearings, Belts and Sheaves Category 2: Refrigeration Category 3: General Hvac Question Deadline 01/29/2026 at 12:00 PM CT Questions to: mpeaprocurement@mpea.com.
Sub-Bidding
Industrial
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2026
March 27, 2026
Multiple Locations, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Feb 17 2026
Chicago, IL
Bid Date: Feb 24 2026
Chicago, IL
Bid Date: Feb 18 2026
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Feb 19 2026
Chicago, IL
Bid Date: Feb 24 2026
Chicago, IL
--
Chicago, IL
Bid Date: Feb 10 2026
Chicago, IL
--
Chicago, IL
Bid Date: Feb 13 2026
Chicago, IL
--
Chicago, IL
Bid Date: Feb 11 2026
Chicago, IL
Bid Date: Feb 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
