Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 2, 2026 at 7:00 PM
Updated February 6, 2026
Site work for a municipal facility in Fremont, California. Completed plans call for site work for a municipal facility.
Electric Vehicle Charger Installation at City Hall for the City of Fremont. If you have any questions relating to delivery , please email jbecerra-scola@fremont.gov . The project is more specifically defined in the Contract Documents, but generally includes the following items of work: Obtaining a City of Fremont Building Permit, installing one (1) dual-port Level 2 electric vehicle charging station and one (1) single port DC Fast Charging station (collectively, EV chargers) and one 75 KVA transformer at the City Hall fleet parking lot, sawcutting and reconstructing existing curb, gutter and sidewalk sections, constructing new concrete sidewalk and footing in landscape area for installation of EV chargers, trenching, backfilling and placing conduit and wiring, installing circuit breakers, and placing hot mix asphalt concrete pavement. There may be other items of work not mentioned above that are shown on the plans and required by the State Standard Specifications and/or the Technical Specifications.
Post-Bid
Municipal
$180,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 5, 2026
March 9, 2026
3300 Capitol Ave, Fremont, CA
Related To This Project
Fremont, CA
--
Fremont, CA
Bid Date: Jan 29 2026
Fremont, CA
Bid Date: Jan 28 2026
Fremont, CA
Bid Date: Mar 20 2026
Fremont, CA
Bid Date: Jan 30 2026
Fremont, CA
Bid Date: Mar 10 2026
Fremont, CA
Bid Date: Mar 05 2026
Fremont, CA
Bid Date: Feb 05 2026
Fremont, CA
--
Fremont, CA
Bid Date: Jan 20 2026
Fremont, CA
Bid Date: Jan 28 2026
Fremont, CA
--
Fremont, CA
Bid Date: Jan 08 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
