Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 19, 2026 at 8:00 PM
Updated March 20, 2026
Site work for a sidewalk / parking lot in Hollister, Missouri. Completed plans call for site work for a sidewalk / parking lot.
The proposed work includes construction of a 5' wide sidewalk on the east side of Birch Rd. from the existing pedestrian crossing at Mall Rd. south to the intersection of Birch Rd. and Industrial Park Dr., and all other incidental related work. All bidders must purchase plans through Great River Engineering, Inc. and be on the planholder list in order to bid the project. Bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the current version of the Missouri Standard Specifications for Highway Construction, with the contractor questionnaire on file 7 days prior to bid opening. Contractors and subcontractors must provide a 10-Hour OSHA construction safety program or similar, to be completed by on-site employees within sixty days of beginning work. A certified cashier's check or bid bond in the amount of 5% is required with each proposal. No 2nd tier subcontracting is allowed. The contract requires compliance with prevailing wage rates as determined by the Missouri Department of Labor and Industrial Relations and the United States Department of Labor. The project will be awarded to the lowest, responsive, responsible bidder. QA date - 2-11-2026 All questions about the meaning or intent of the contract documents shall be submitted to the Design Professional in writing. Replies will be issued by written addenda to all parties on the planholder list. Only questions answered by formal written addenda will be binding. Any alternate material shall be approved prior to the bid opening and in sufficient time to issue an addendum. No alternates will be approved unless approved in a written addendum. Questions must be received by the Design
Award
Sidewalks / Parking Lot
$182,802.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 18, 2026
April 20, 2026
Birch Rd, Hollister, MO
Related To This Project
Hollister, MO
Bid Date: Mar 01 2026
Hollister, MO
Bid Date: Apr 01 2026
Hollister, MO
Bid Date: Jan 12 2026
Hollister, MO
Bid Date: Dec 03 2025
Hollister, MO
--
Hollister, MO
Bid Date: Sep 16 2025
Hollister, MO
Bid Date: Sep 23 2025
Hollister, MO
Bid Date: Jul 23 2025
Hollister, MO
Bid Date: Jun 18 2025
Hollister, MO
Bid Date: Nov 14 2025
Hollister, MO
Bid Date: Mar 10 2025
Hollister, MO
Bid Date: Mar 14 2025
Hollister, MO
Bid Date: May 29 2024
Hollister, MO
Bid Date: May 06 2024
Hollister, MO
Bid Date: Mar 01 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
