BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 9, 2026 at 7:00 PM

Updated February 10, 2026

Site work for a mixed-use development in Grand Junction, Colorado. Completed plans call for site work for a water / sewer project; and playground / park / athletic field.

Reference Number 0000410526 Bid Intent Not Available Colorado Mesa University is soliciting repairs to the subsurface drainage system and replacement of the artificial turf at the softball stadium. The work is part of a stadium refresh that will be split into two phases as described in the scope. Scope of Services. Phase 1: Improve the drainage around the baselines and behind Homeplate by installing new pipe that ties into the existing manhole and regrading of the subsurface. The existing artificial turf will be removed and replaced with new artificial turf to include the dugouts. The new turf will have the interlocking CMU logo behind Homeplate. The zone where the infield meets the outfield will need to be reworked to form a smooth transition between the dirt and the grass. Phase 2: The existing batting tunnel will be removed and replaced with a tension batting tunnel typical of the baseball stadium. The damaged areas of the backstop and along with the baselines that will be replaced with new chain-link, and the sections that remain will be repainted. The existing poles will have the old paint stripped, primed and repainted. New paint will be applied to the fencing up to the outfield fence, and the rails in front of the dugouts. New pads are to be added to the outfield fence. The existing perimeter fence along the west and south perimeter of the stadium is to be painted and repaired. Question Deadline 02/10/2026 at 11:00 AM MT Questions are submitted online Yes, Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule. POINT OF CONTACT/CLARIFICATION Name: Tracey Cornwell Agency: Colorado Mesa University Phone: 970.248.1433 Email: tcornwell@coloradomesa.edu Additional The start of the project will be in May 25, 2026 and will need to be complete by July 31, 2026. If a contract amounts to $150,000 or more, the awarded contractor shall provide payment and performance bonds not less than 50% of the value of the contract. The costs associated with this bond are to be included in the contractor's bid. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - FOB Destination - FOB Pre-Paid - Insurance Required - License Required - Material Safety Data Sheets Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information.

GC Bidding

Water / Sewer

$310,000.00

Public - State/Provincial

Site Work

5

3

8

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
16
Bidding Soon
178
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

May 25, 2026

Project location map

959 Orchard Ave, Grand Junction, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.