BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2026 at 8:00 PM

Updated March 12, 2026

Site work and paving for a mixed-use development in West Valley City, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Construct a multipurpose asphalt path, about 3.84-miles in length within the Utah & Salt Lake Canal corridor from about 4130 West 4700 South in West Valley City, then southeast through Kearns to about 6460 South 2200 West in Taylorsville City. Question Deadline 02/11/2026 at 1:00 PM MT The Utah And Salt Lake Canal Trail Phase 6 Is A Continuation Of Phase 5 And Extends Southeast Along The Utah And Salt Lake Canal. Due To Lack Of Space On The South Side Of The Canal Phase 6 Is Primarily Located On The Existing Canal Maintenance Road. An Asphalt Multi-use Path Of Varying Widths (10' - 12' Wide) Replaces The Asphalt Millings Maintenance Road. Improvements Along The Trail Include, Asphalt Multi-use Path, Concrete Sidewalks And Ada Ramps, Directional Trail Signage, Custom Monument Signage, Fencing, Opposite Bank Vegetation Clean Up, And Pedestrian Crossing Signage/signals. Only On The West Valley Property Have 2 Collapsible And 4 Stationary Bollards In The Base Bid, All Others Are In Bid Alt 1. At Major Streets Where Mid-block Crossings Are Not Feasible, The Trail Alignment Leaves The Canal Maintenance Road And Follows A Variety Of Sidewalks, Bike Lanes, And Intersections. These Sections Rely On The Monument Signs And The Directional Trail Signage On Existing Poles To Direct Users Back To The Canal Corridor. The Trail Rules Signage Are To Be Purchased And Installed By The Salt Lake County. The Phase 6 Trail Alignment Is Located In 2 Different Cities (West Valley City & Taylorsville City) And Extends Through Multiple Udot Right Of Ways, Requiring Permitting With All 3 Jurisdictions. The Canal Company Owns The Land/canal And Has Contracted With Salt Lake County To Allow Use Of Their Corridor. The Trail Alignment Is Located Within A Jordan Valley Water Conservation District (Jvwcd) Pipeline Easement, Requiring Caution And Detailed Coordination With Jvwcd. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Intent to Bid by Feb 18, 2026 1:00 PM MST.

Post-Bid

Roads / Highways

$1,900,000.00

Public - County

Paving, Site Work

34

18

8

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2026

March 1, 2026

Project location map

Multiple Locations, West Valley City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.